My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006846
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2900 - Site Mitigation Program
>
PR0537485
>
ARCHIVED REPORTS_XR0006846
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 4:47:50 PM
Creation date
7/27/2020 3:41:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006846
RECORD_ID
PR0537485
PE
2957
FACILITY_ID
FA0021568
FACILITY_NAME
FORMER RAINWATER CAR WASH
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21931206
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/25/2001 14 46 20946710 AGE STOCKTON PAGE 08 <br /> 22 June 2001 <br /> AGE-SSC Protect No 97-0333 <br /> Page 10 of 10 <br /> solvent compounds The final two vessels will Contain SunSolve, a liquid phase filtration media <br /> specifically designed to adsorb fuel oxygenated compounds(i e TAME,MTBE and TBA) Sample <br /> ports are located between all vessels to allow detection of potential media break through and to <br /> obtain final discharge samples The system layout is depicted in Figure 5 <br /> 4 5 REMEDIATION SYSTEM START-UP PERIOD <br /> During the pump and treat start-up period (first two weeks of operation), ground water influent and <br /> effluent of the treatment system, depth to ground water measurements and operational parameters <br /> (ground water flow meters, fluid level sensors, total flow indicators) will be monitored daily during <br /> the start-up period to erasure optimal removal of dissolved hydrocarbons and dissolved MTBE <br /> 4 6 MONITORING AND MAIN7ENANTCE ACTIVITIES <br /> Ground water samples from the pump and treat system influent,effluent and intermediate stages will <br /> . be collected on a bi-weekly basis and submitted to a State of California Department of Health <br /> Services (DHS)-certified laboratory£or analysis of the following constituents <br /> TPH-g and TPH-d in accordance,A ith EPA Method 8015 Modified/5030/3550, <br /> BTEX and MTBE in accordance with EPA Method 8020, and <br /> MTBE, ETBF, TAME, DIPE and 1BA and chlorinated solvents in accordance with EPA, <br /> - 8260 <br /> Laboratory reports for ground water analysis, testing methods, laboratory quality assurance/quality <br /> control (QA/W,) reports and sample chain of custody documentation will be presented m quarterly <br /> reports <br /> Ground eater treatment operational paramuters will be monitored at a mmimurn of wdekly to <br /> monitor cleanup progress The groundwater tieatxxlent system will be m,-untalned on a 1A eekly basis <br /> 3cGording to manufactureis reco=endatious <br /> Adi ats,r�r Pu F n+t*nrzt�e+si, <br />
The URL can be used to link to this page
Your browser does not support the video tag.