Laserfiche WebLink
I <br /> r', I <br /> f 26 April 2004 1 ' <br /> i AGE-NC Project No 97-0333 ; <br /> ' Page 4 of 12 <br /> concentrations of 58 µg/1 and 60 µg/l, respectively, TCE was detected in the December sample at <br /> ' a concentration of 14 µg/1 , PCE was detected from the September, November and December <br /> samples at concentrations as high as 190 µg/1 in the December sample <br /> ' The laboratory analysis did not detect any other constituents of concern Analytical results of <br /> extraction and treatment influent-water samples (McCampbell Analytical Inc Work Order Nos <br /> ' 0309192, 031'0447, 0311267, Cal Tech Environmental Laboratories ID No 0312-204) are <br /> summarized in Table 1, laboratory reports are in Appendix A <br /> ' 215 EFFLUENT MONITORING RESULTS <br /> In accordance with the requirements ofCMPWD Industrial Wastewater Discharge Permit No 021 1, <br /> ' monthly groundwater extraction and treatment effluent monitoring was performed on 10 September, <br /> 27 October, 19 November and 26 December 2003 for flow rate and laboratory analysis of <br /> ' I contaminants listed in Section 2 3 Additionally, confirmation sampling for MTBE and TBA was <br /> conducted on 18 September, 24 September and 13 October 2003 <br /> During the September 2003 monitoring event,the 10 September 2003 effluent water sample detected <br /> TBA at a concentration of 80 micrograms per liter(µg/1) and was confirmed on 18 September and <br /> on 24 September 2003 at concentrations of 70 p:g/l and 190 µg11, respectively Laboratory analysis <br /> ' of extraction and treatment effluent grab water samples did not detect any other constituents of <br /> concern Analytical results are summarized in Table 1, laboratory reports are in Appendix A <br /> 1 I ! ' <br /> � Utilizing aBlue-White Industries F-2000 flow meter,total flow(totalizer)was recorded between 10 <br /> September 2003 and 26 December 2003 (Table 5) During this time, the extraction and treatment <br /> ' interim ground water remediation system was in operation for approximately 75 days Based on the <br /> total of approximately 205,130 gallons of water recorded during this time, AGE estimated that an <br /> average 2,735 gallons of water was discharged pen day during this time i <br /> I ` <br /> 2 6 MASS-VOLUME REMOVAL CALCULATIONS <br /> 1I ' I s 6 i ' ` I <br /> , F 1 <br /> Between 10 September and 26 December 2003,an estimated 5 18 pounds of MTBE was extracted j <br /> from ground water (Table 5),,since the system was Iinrtlated on 21 January 2002, a total mass of <br /> 1 220 34 pounds of MTBE has been removed The September 2003 to December 2003 mass-volume <br /> calculations of MTBE-impacted ground water extracted from the'ground water ektraction and <br /> it I treatment 'system are presented in Appendix B Plots,of cumulative ground water pump and treat <br /> mass 'removal trends and influent ground water MTBE ,concentrations versus time are� in, v <br /> I Appendix C F <br /> J <br /> Advanced Gen Environmental,Inc <br /> 1 . I <br /> I e <br /> l'Y <br />