Laserfiche WebLink
I <br /> 1 <br /> 1 15 October 2002 I ' <br /> AGE-NC Project No 97-0333 <br /> ' Page 8 of 8 <br /> 1 <br /> I <br /> I I <br /> � 1 � <br /> m 5.0. RECOMMENDATIONS <br /> Based upon the results of the second quarter 2002 investigation, AGE recommends <br /> 1 I •' Continued quarterly ground water monitoring utilizing wells MW-1 through MW-6 for <br /> characterization of ground water conditions on the site <br /> • Future ground water sampling should include full EPA Method 8260 analysis as well as <br /> 1 analysis for PCBs I <br /> Continued ground water extraction (interim ground water remediation) from well EW-1 <br /> 1 I I <br /> A work plan addendum,dated 03 April 2002,was submitted to the EHD for installation of additional <br /> 1 I shallow and deep-screened(multi-level)ground water monitoring wells,the EHD approved the work <br /> plan addendum by letter dated103 April 2002 Between 23 September and 04 October 2002, seven <br /> multi level ground water monitoring wells were installed at the site and will be implemented into <br /> 1 the Rainwater Car Wash monitoring program <br /> ,1 • <br /> 6.0. , LIMITATIONS <br /> , � I <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br />' upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> ' available data points (ground water samples), and subsurface conditions may vary away from these <br /> data points No other warranty;expressed or implied, is made as to the professional interpretations, I <br /> 1 opinions and recommendations contained in this report <br /> f ! 4 <br /> I r I <br /> I <br /> I , <br /> I <br /> u I <br /> 4 <br /> I I <br /> E 1 <br /> ! ' Advanced Geo Environmental,Inc <br /> I I <br /> ill I I I <br />