Laserfiche WebLink
McCamabell Analytical Inc 1534 Willow Paaa Road,Plnsburg,CA 94565-1701 <br /> "When Quality Counts" Toll Free Telephone:(877)252-9262/Fax (925)252-9269 - <br /> http://www.mccampbell.com/E-mail:mam@,accampbell.com <br /> ---------------------------- <br /> WORK ORDER SUMMARY <br /> Client Name: GEOCONENV- CONSULTANTS <br /> Project: E8857-02-02;Manteca Firing Range <br /> Client Contact: Rick Day Work Order: 1703873 <br /> Contact's Email: day@geoconinc.com Comments: QC Level: LEVEL 2 <br /> Date Logged: 3/17/2017 <br /> ❑WaterTrax ❑WriteOn ❑EDF ❑Excel Fax kd Email <br /> ❑Hardcopy ❑ThirdParty ❑J-flag <br /> Lab ID Client ID Matrix Test Name <br /> Containers Bottle&Preservative De- Collection Date TAT Sediment Hold SubOut <br /> /Composites chlorinated <br /> 1703873-OIOA P12 &Time Content <br /> Soil SW6020(Lead) I 40Z GI <br /> 1703873-OIIA H3 Soil SW6020(Lead) 1 ❑ 3/16/2017IL44 5days ❑ <br /> 1703873-012A P14 40Z GJ El 3/16/2017 It:,, 5days <br /> Soil SW6020(CAM 17)<An[imony, 1 40Z GJ ❑ <br /> Arsenic,Barium,Beryllium,Cadmium, ❑ 3/16/2017 11:48 5 days ❑ <br /> Chromium,Cobalt,.Copper,lead, <br /> Mercury,Molybdenum,Nickel, <br /> Selenium,Silver,Thallium,Tin, <br /> Vanadium,Zinc> <br /> SW8270C(PAHs/PNAs) <br /> 1703873-013A P15 Soil SW6020(Lead) 11 <br /> ad) ❑ <br /> I 40Z GJ ❑ 3/16/2017 11:49 5 days <br /> 1703873-014A Pl6 Soil SW6020(Lead) <br /> 40Z GJ ❑ <br /> 1703873-6ISA Pl7 Soil SW6020(Lead) 1 40Z GJ ❑ 3/16/201711:53 Sdays ❑ <br /> 1703873-016A P18 Soil SW6020(CAM 17)<Antimony, 1 ❑ 3/16/2017 1 C54 5days ❑ <br /> Arsenic,Barium,Beryllium,Cadmium, 402 GJ ❑ 3/16/2017 12:01 5 days ❑ <br /> Chromium,Cobalt,Copper,Lead, <br /> Mercury,Molybdenum,Nickel, <br /> Selenium,Silver,Thallium,Tin, <br /> Vanadium,Zinc> <br /> SW8270C(PAHs/PNAs) • <br /> 1703873-017A G12 Soil SW6020(Lead) ❑ 5 days ❑ <br /> 1 40Z GJ ❑ 3/16/2017 1203 5 days <br /> !703873-018A Gll Soil SW6020(Lead) ❑ <br /> 1 40Z GI ❑ 3/16/2017 12:07 5 days <br /> NOTES: -STLC and TCLP extractions require 2 days to complete; therefore,all TATs begin after the extraction is completed (i.e., One-day TAT yields❑results <br /> in 3 days from sample submission). <br /> -MAI assumes that all material present in the provided sampling container is considered part of the sample-MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 2of4 <br /> Page 37 of 44 <br />