Laserfiche WebLink
ENVIRONMENTAL IMPACT MMRP 4.0 <br /> MITIGATION MEASURE MON/TORING <br /> becomes available. RESPONSIBILITY TIMING VERIFICATION <br /> • Install lowf1Owfaucets, toilets,andshowers as applicable (DATEIINITIALS) <br /> • Use water-efficient irrigation systems throughout the Plan Area <br /> • Institute Recycling and Composting Services to achieve a 50%reduction in <br /> waste disposal(compared to a baseline of a business os usual approach in <br /> 2015) <br /> HAZARDS AND HAZARDOUS <br /> MATERIALS <br /> Impact 3.8-1:Potential to create Mn/g°h°^Me°sure 3.8-1:The project proponent shall hire°qualified consultant to Project <br /> a significant hazard through the Perf°n^a Phase 2 ESA prior to the issuance of grading permits or demolition permits Proponent Or • <br /> routine transport, use, or for construction activities in the following areas that have been deemed to have Prior to the <br /> disposal of hazardous materials potential hazardous conditions present each individual Issuance <br /> of <br /> or through the reasonably . phase grading permits <br /> foreseeable upset and accident Prior to grading activit/es in areas previously used for agricultural uses. Of or demolition <br /> development or permits, <br /> conditions involving the release • Prior to removal of the single-wide mobile home unit that was formerly a Portion o an for <br /> of hazardous materials into the f activities <br /> on <br /> used in conjunction with the Manteca Police Department shooting range. Of de el phase activih'es in the <br /> environment of development areas that are <br /> • Prior to grading activities on the shooting range site. The Project deemed to have <br /> Proponent shall potential <br /> • Prior to removal of the remnant construction and/or farmin Provide evidence hazardous <br /> (Le.remnant pipes,etc.)on the project site,most notably those located on of <br /> city Ce a° conditions <br /> the north-south farm-road that is located just north of the shooting range. f Present <br /> community <br /> Manteca <br /> • Prior to grading activities in the area on the western side of the project Development <br /> near McKinley that historically served as a farm yard for agricultural Department <br /> equipment implements,etc. for <br /> review and <br /> The intent of the Phase 2 ESA is to:1)sample the soils for residual agrichemicals,2) approval, <br /> sample any areas that appear stained, and 3) investigate whether any of the <br /> buildings facilities asbestos-containing materials and lead that could <br /> ia <br /> become friable or mobile bile during demolition activities. If toxic levels of residual <br /> agrichemicals are found, the contaminated soil shall be excavated from the site and <br /> disposed of at an Off site disposal facility designed to accept such waste. If any <br /> stained soils are found, the contaminated soil shall be excavated from the site and <br /> disposed of at an off-site disposal facility designed to accept such waste.If asbestos- <br /> containing materials and/or lead are found in the buildings, ° Cal-OSHA certified <br /> ACRM and lead based paint contractor shall be retained to remove the asbestos- <br /> Final Environmental Impact Report—Manteca Family Entertainment Zone <br /> 4.0-19 <br />