My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2516
>
2900 - Site Mitigation Program
>
PR0540433
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 6:45:37 PM
Creation date
7/27/2020 4:09:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0540433
PE
2953
FACILITY_ID
FA0023104
FACILITY_NAME
FORMER MANTECA POLICE FIRING RANGE
STREET_NUMBER
2516
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
24131044
CURRENT_STATUS
01
SITE_LOCATION
2516 W YOSEMITE AVE
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rick, <br /> I was present to observe Luann marking the excavation outline and later Luann and Chris collecting the last two of ten <br /> soil samples. My notes indicate Luann was marking the margin of the RCRA waste area. <br /> As the 9th sample was being collected Chris said the samples were being collected approximately 5 feet outside the <br /> excavation area; I asked if these were at 25-foot or 50-foot intervals,thinking of my requirement for grid sampling <br /> outside the excavation for background sampling; he answered that it was 25 to 50-foot intervals.As the 10th sample was <br /> collected,Chris and Luann noted that they were locating previous XRF points by GPS to identify collection <br /> points. Thinking about this later, I have a few questions about this sampling event: <br /> 1. This does not appear to be following the work plan approval condition of collecting additional samples from 25- <br /> 1 grids outside the excavation area and at 50-foot grids in the next tier removed from the excavation area until <br /> the whole parcel that falls within the legal description(in preparation) area.Are these samples still to be <br /> collected during confirmation sampling? <br /> 2. 1 believe Chris mentioned (I might be wrong here)these being additional background samples, if this is the case, <br /> aren't they a bit close to the excavation area? <br /> 3. To make a correlation between XRF and soil analytical data, would it not be better to take an XRF reading and <br /> collect the sample from the exact same spot? <br /> Mike Kith will be taking over this case from me, his number is(209)468-3444. Rick,a pleasure working with you on this <br /> site, I respect your expertise and professionalism and am glad to have had the opportunity to work with you. <br /> Nuel Henderson <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.