Laserfiche WebLink
i <br /> Ramona Booze -2- October 29, 2001 <br /> • The work products must be acceptable to the County. <br /> • If a different scope of work becomes necessary, the you must request pre-approval of costs <br /> on the new scope of work. <br /> • Although I have referred to the GTI proposal in my pre-approval above,please be aware that <br /> you will be entering into a private contract. the State of California cannot compel you to sign <br /> any specific contract. This letter pre-approves the corrective action related costs as <br /> presented in the proposal dated July 24, 2001,by GTI. <br /> I also want to remind you that the Fund's regulations re uire that you obtain at least three bids, <br /> or a bid waiver from Fund staff, from qualified firms f4 all necessary future corrective action <br /> work. If you need assistance in procuring contractor and consultant services, don't hesitate to <br /> call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Re uest Instructions to confirm that the costs are consistent with this pre- <br /> approval before you will be reimbursed. Please insure that your consultant prepares their <br /> invoices to include the required breakdown of costs on a time and materials basis, that <br /> invoiced tasks are consistent with the original proposal, and Haat reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached t (916) 341-5796. <br /> Sincerely, <br /> Mark Owens, Water Resources Control Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> California En vironmental frvtectfon Agency <br /> .4 <br /> P.a Recycled Paper- - <br />