Laserfiche WebLink
SJPHD will be notified 48 hours prior to completing any of the proposed field tasks within this <br /> workplan. <br /> The following summary table indicates the detection I its requested from the laboratory. <br /> DETECTION I IMITS <br /> 04/20/1"8 <br /> ANALYTICAL DETECTION LIMIT DETECTION LIMIT <br /> METHOD (SOIL) (WATER) <br /> TPH/GASOLINE 1.0 MG/KG 50 UG/L <br /> B.T.X.E. 0,005 MG/KQ 03 UG/L <br /> LEAD 2.5 MG/KG 0.1 MG/L <br /> ................. ........... ...... ...... ............ <br /> ... . ............................ .......... ........... ......... <br /> ........... .................... <br /> X X <br /> .............. ... .. .............. <br /> OXYGENATES <br /> MIME 50 UG/KG 5 UG/L <br /> CAL <br /> OD <br /> OLV <br /> H/GAnS 'OE' <br /> DILPE 50 UG/KG 5 UG/L <br /> TAME 50 UG/KG 5 UG/L. <br /> ETBE <br /> 50 UG/KG 5 UG/L <br /> TBA 50 UG/KG 50 UGAL <br /> All decontamination water or purge water will be con aired in DOT 17 poly drums and stored on <br /> site until proper disposal methods are determined. <br /> All purge water generated during the hydropunch sampling tasks will be contained on site in <br /> poly drums for containment and determination prior to disposal. <br /> Upon completion of each soil boring and subsequei tly retrieving a grab water sample a neat <br /> cement slurry will be pressure grouted via a trimmie be into the open boring until the boring is <br /> filled to the top and all settling has subsided. <br /> In addition to the originally proposed scope of wof i and as requested by San Joaquin Public <br /> Health, a 2000 foot radius well survey/inventory wilbe completed around this site. <br /> TED PETERS TRUCKING/MAI TIECA WORKPLAN <br /> 5 <br />