Laserfiche WebLink
UNDERGROUND STORAGETANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,d 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Site Address : ,,,,„ CHARTER WAY <br /> C STORE <br /> A = ANNI LAR <br /> . . . . . F = FILLS <br /> T = TLTRBLNt E <br /> . . . . . P = PROBE <br /> V = VAPOR <br /> Y = SUI EP SENSOR <br /> L = Leak Detector <br /> N - Al = 11amray <br /> B = Brine Sensor <br /> . . . - - I = Smart Sensor <br /> S = STP <br /> C = Floats & Chains <br /> . I F - E = Estop <br /> . e . <br /> H <br /> . . . . . . . . . . . _ . A <br /> R <br /> . . . . . . . . . . . . . . _ . T <br /> . . a. ,. . . . . s _ E <br /> � . . . . . . . . . . . . . . . � . . - . R <br /> F60 <br /> - - - <br /> YY <br /> A <br /> .VENTS. - <br /> *'PIPING � <br /> (.ARROWS) . . . . . . . <br /> Drawing of pipma . . . . . <br /> exit of sump and - $ 7 91 . . . . . . . . <br /> UDC' *. *AND % E <br /> underground <br /> drawing is TL a P0Cr (D (D <br /> O TL <br /> cannot speculate <br /> blue prints. <br /> Aliv irenrs rrrrkrgrofarl rhos mY not tisiblr ro r1a? cer7j(irrg iocir fcfmr ore a <br /> Fa-Qfessfaarl oFiraanoDrmringg <br /> rnr ro seede <br /> Date map vias drawn: 06,124Q191 <br /> Instructions <br /> If you already have a diagram that shows all required information. you may include it rather than this page, with your Monitoring System Certification. On your site plan . <br /> show the general layout of tants and piping. Clearly identify locations of the following equ'pment, if installed: monitoring system control panels; EenSDrs monitoring tan'mc <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or e[ectranic line leak detectors; and in-tank fiquid level <br /> probes (if used for leak detection). In the spare provided, note the date this Site Plan was prepared. <br /> LEGEND <br />