Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors, and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address- SRH US GASOLINE 749 E. CHARTER WAY STOCKTON CA 95206 <br /> Drawing of piping <br /> exit of sump and <br /> UDU3. No <br /> underground <br /> dranv�g is <br /> CAS <br /> we <br /> cannot speculate . . . - . . . <br /> blue prints. <br /> PA <br /> aTLS <br /> . <br /> L <br /> x DIE _ <br /> L KEY <br /> 87 A = ANSUI .AR <br /> F = FILLS <br /> T = TURBLNE <br /> P = PROBE <br /> V = VAPOR <br /> Z = SU.N P SENSOR <br /> L = Leak Detector <br /> FL kl = lllamca� <br /> a P t' 97 B = Brine Senror <br /> x X I = Smart Seuror <br /> S = STP <br /> C = Floats & Chains <br /> E = E Stop <br /> CHARTER IVAY <br /> iteotrinrkt;rordthesare not tisibletoti ceiij&nyterlaricfarrere a <br /> 7r4fessi0rzr1apfr0f0fr01a1• arrlrn-eacde�tfia it{enrz:tinrrrl�nyrc�- lhmrbr� <br /> rut to sccde <br /> Date rAeRFI�s r tp y.'3111g <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include_ it, rather than this page, with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locafons of the following equipment, it Installed: monitoring system control panels; sensors monitoringiank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in4ank liquid level <br /> probes (if used for leak detection). In the =_pace provided, note the date this Site Plan was prepared. <br /> LEGEND <br />