Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer D Industry Standard Li Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx.45' Approx.50' Approx.30' <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 <br /> Wait time between applying Rv "+ <br /> ressure and startin test: 5 Minutes 5 Minutes 5 Minutes = t <br /> 1a —All <br /> Test Start Time: 8:30 8:35 8:40 <br /> Initial Reading(Rj): 3 Psi 3 Psi 3 Psi AUG 00 ?W <br /> Test End Time: 9:30 9:35 9:40 <br /> ENVIR9 ^s <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi HIFALTH F 1AP <br /> Test Duration: I Hour 1 Hour 1 Hour 1 <br /> Change in Reading(RF-RI): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />