Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,p 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring ventltransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address: VAN DE POL 351 N. BECKhU1N ROAD LODI CA 95240 <br /> HIGHWAY 99 N —► <br /> A = ,1N.NULAR <br /> F = FILLS TLS 350 <br /> . T = TURBINE *PD?LNG } <br /> P = PROBE (ARROWS) CA 5 <br /> V = VAPOR Drawing of piping <br /> X = SUAfP SENSOR eat of sump and <br /> L = LeakDetector LTD C's. \o 000 0 . <br /> AI = Afamway underground VENTS. . <br /> B = Brine Sensor drauving is ugypop� <br /> I = Smart Sensor the cannot _ _ . . . . _ _ . . . . . . . <br /> S = STP speculate blue <br /> C = Floats & Chains <br /> E = £ Stop prints. <br /> JT <br /> (� L <br /> OII. v <br /> t - X L <br /> L <br /> 4 2 <br /> L X �� <br /> X \� <br /> L F X <br /> X <br /> L X <br /> X7 . <br /> v <br /> s _ . a . . . . . X <br /> 351 N. BECKMAN ROAD <br /> S • <br /> d?W items underground that are nor visible to the certi&-ing tsrhnicfmi are a <br /> prgfassfonal opinion mit& mrd are soleti+for i tformational proposes. Drawug <br /> not to scale <br /> Date map eras drawn : 646-19 <br /> Instructions <br /> If you already have a diagram that shows a9 required Information, you may include it rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify Iocatons of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />