Laserfiche WebLink
-'` 'PLIED <br /> 1 AEROSPACE <br /> STRUCTURES <br /> CORP. <br /> Mr. Michael P. Kith Page 2 <br /> December 9, 1997 <br /> Item 47 No emergency coordinator <br /> Response: A primary emergency coordinator and alternate emergency coordinators <br /> have been named in our Contingency Plan. Within our facility's <br /> Emergency Response Plan, these positions were known as emergency <br /> commanders. <br /> Item 49 Personnel training records incomplete. <br /> Response: The Hazardous Waste Management Employee Training Plan is attached. <br /> Job titles for each position at the facility related to hazardous waste <br /> management and the names of employees filling each job are also attached. <br /> Item 75 Air filters from paint booth are not contained at satellite accumulation area. <br /> Response: All hazardous waste has been contained. <br /> PBR, CA, AND CE PROGRAM <br /> Item 1 Contingency plan is not complete. It does not address the hazardous waste <br /> treatment facility and emergency procedures. <br /> Response: Contingency plan identifies the conversion coating rinse water under <br /> Section 5, Assessment of Anticipated Hazardous Waste Incidents and <br /> summarizes the response in case of a liquid spill. <br /> Item 2 Written training documents and records do not address treatment facility. <br /> Response: Training for the chromium treatment facility is covered under the Slug <br /> Discharge Control Plan required by the City of Stockton POTW. Training <br /> was completed on July 16, 1997 and was given to operators of the <br /> treatment unit. A copy of the training sign-up sheet and applicable portions <br /> of the Slug Discharge Control Plan are attached. <br /> Item 29 There was an accidental release to the sewer of hazardous waste <br /> constituents from the chromium treatment system. <br />