My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIELD
>
1848
>
2231-2238 – Tiered Permitting Program
>
PR0507035
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 2:50:33 PM
Creation date
7/30/2020 7:42:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0507035
PE
2231
FACILITY_ID
FA0007100
FACILITY_NAME
TYCO
STREET_NUMBER
1848
STREET_NAME
FIELD
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
1848 FIELD AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\F\FIELD\1848\PR0507035\COMPLIANCE INFO.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility and PBR Units Closure Work Plan <br /> r 1848 and 1856 Field Ave.,Stockton, California <br /> 8.0 CERTIFICATION OF RESPONSIBLE PROFESSIONAL <br /> r <br /> Earth Tech has prepared this Work Plan under the supervision of a professional engineer registered in the state <br /> of California. Earth Tech has prepared this Work Plan in accordance with applicable regulations,so that the <br /> actions described herein meet regulatory guidelines for PBR and facility closure.Field procedures will be as <br /> ` presented in Appendix D of the Facility Closure Plan. <br /> This action plan will be conducted by Earth Tech and subcontracted personnel experienced with the specified <br /> work and having OSHA 40-hour safety training as required under 29 CFR 1910.120.Appropriate health and <br /> safety measures,including a site-specific health and safety plan,will be implemented during facility closure <br /> activities in order to ensure the safety of personnel and the environment during the actions described herein. <br /> V <br /> �QQ<70FESS/p,�l <br /> 3 No. 55753 ` <br /> ` Exp. 31 <br /> sj clvl\ SNP <br /> QFC <br /> r <br /> William M. Knight,PE <br /> Environmental Engineering Group Manager <br /> L:IW0W690991GenerarL1Ye1d WPIReld Ave WPAvg03rev24" 16 August 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.