My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1992 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL PARK
>
400
>
2231-2238 – Tiered Permitting Program
>
PR0507158
>
COMPLIANCE INFO_1992 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:19:51 PM
Creation date
7/30/2020 7:44:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1992 - 2012
RECORD_ID
PR0507158
PE
2231
FACILITY_ID
FA0005324
FACILITY_NAME
SILICON TURNKEY SOLUTIONS
STREET_NUMBER
400
STREET_NAME
INDUSTRIAL PARK
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
22119048
CURRENT_STATUS
02
SITE_LOCATION
400 INDUSTRIAL PARK DR
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\I\INDUSTRIAL\400\PR0507158\COMPLIANCE INFO 1992 - 2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . 1 Operation <br /> CLARIFIER TANK The wastewater from the flocculation <br /> tank which contains heavy metal which is <br /> trapped by polymer and flows to the <br /> gravitational flow section of the <br /> clarifier tank. <br /> From this point, the heavy metal sinks <br /> to the bottom of the clarifier tank and <br /> the wastewater free of metal flows to <br /> the city through the paddle wheel <br /> flosensor. <br /> The pH probe is located at the <br /> gravitational flow section to check <br /> wastewater pH before it flows to the <br /> City. If 0-6 or 10-12 pH range, the pH <br /> probe sends a signal to the pH monitor <br /> #3 on the electrical panel to energize <br /> the alarm. <br /> The timer on the electrical panel is <br /> used to energize both, 1 ) 2-way solenoid <br /> valve at sludge thickener tank 2) 2-way <br /> solenoid valve at clarifier tank. Both <br /> valves energize at same time while the <br /> 2-way solenoid valve at clarifier tank <br /> is energized by the timer . Air then <br /> flows through the 2-way solenoid valve <br /> and F/R/L unit to the air diagram Wilden <br /> pump to operate. The heavy metal in <br /> wastewater flows from the bottom of the <br /> clarifier tank to the sludge thickener <br /> tank. <br /> SLUDGE THICKENER TANK The wastewater containing the heavy <br /> metal is pumped from the bottom of the <br /> clarifier tank to the sludge thickener <br /> tank, where the heavy metal of the <br /> wastewater has more time to sink to the <br /> bottom. The wastewater free of heavy <br /> metal at the top of the sludge thickener <br /> tank then overflows back to equalization <br /> tank A for pretreatment. <br /> While the 2-way solenoid valve at the <br /> sludge thickener tank is energized by <br /> the timer, air flows through the 2-way <br /> solenoid valve and F/R/L unit to the air <br /> diagram Wilden pump to operate. The <br /> heavy metal wastewater flows from the <br /> bottom of the sludge thickener tank to <br /> filter press. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.