Laserfiche WebLink
B. Emergency Response and Contingency Plan. <br /> 1. Emergency Response Coordinator. <br /> a. Who <br /> b. Responsibilities <br /> 2. Emergency Response Team. <br /> a. Who are members <br /> b. Duties <br /> 3. Emergency response procedure and requirements. <br /> a. Why do we have a plan <br /> b. What is covered in the plan <br /> 1. Fire/explosion <br /> 2. Earthquake <br /> 3. Power outage <br /> 4. Hazardous material spill or release <br /> C. Evacuation plan. <br /> 1. Routes <br /> 2. Location of safe/assembly area. <br /> d. Notification <br /> 1. General Fire Alarm Bells. <br /> a. All plant evacuation <br /> b. Two(2) short rings of the fire alarm bells means <br /> ERC and ERT members will report to the <br /> Security office <br /> e. Emergency Spill Equipment Cabinets <br /> 1. South Pad <br /> 2. Chemical warehouse <br /> C. Fire Alarm System. <br /> 1. Monitoring of system <br /> a. Valley Alarm <br /> b. Security office <br /> 2. Location of monitoring equipment <br /> 3. Operation of Fire sprinkler system <br /> D Training <br /> 1. Who must complete training. <br /> a. Emergency Response personnel <br /> b. Personnel handling Hazardous waste <br /> 1. Personnel working directly with Waste being generated <br /> in the MECO <br /> and the wastewater treatment areas will be given <br /> additional training. <br /> a. This will include personal protective equipment <br /> needed. <br /> b. Handling of empty containers. <br />