My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1443
>
2231-2238 – Tiered Permitting Program
>
PR0507023
>
COMPLIANCE INFO_1994 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2020 12:24:44 PM
Creation date
7/30/2020 7:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994 - 2018
RECORD_ID
PR0507023
PE
2232
FACILITY_ID
FA0001542
FACILITY_NAME
VIKTRON EXPRESS
STREET_NUMBER
1443
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16330017
CURRENT_STATUS
02
SITE_LOCATION
1443 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
FilePath
\MIGRATIONS\Tiered Permitting\N\NAVY\1443\PR0507023\COMPLIANCE INFO 1994 - 2018.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
} 1 � <br /> m <br /> 0 <br /> 0 <br /> HAL WAM GENE"TOR CONDITIONAL JUMVI 1I(1Y CONDMONAL AUTHO11i AMON PE"lU HY RULE <br /> UAnnu) <br /> Post Closure Not required ifclean closure. Not required ifclean closure. Not required if clean closure. Not required ifelean closure. <br /> H&SC 25189.2(c)prohibits the H&SC25245.4(h)(3) H&SC 25245,4(a)(3yTTU&M <br /> on-site disposal.of hazardous Generator shall ont be required to provide Generator sball not be required to <br /> tvasta at an unauthorized point by financial assurances for post closure prot7de financial assurancePs Far osl <br /> a generator. maintenance pursuant to H&SC25245(a)(2). closure maintenance pursuant to H&SC <br /> 40 Post c7asure isnot required unless Ifcootamina[ioo remains after closure,Ihen 25245(a)(2). <br /> one or more of0e foltowing lfeontamination remains after closure,then thve Facility is also the facility is also subject to generator i1 contamination remains at either <br /> specified 9D day generator subject to all applicable generator requirements,includiog requirements,including requirements for TTU&FMaBer closure,the owneff <br /> regntrements apply to certain requirements for landfills,pursuant to H&SC 25201.5(d)(9) landfills,pursuant to H&SC 25200.3(c)(1} operator is subject toHK SC <br /> tanks/containers,drip pads,and 25200.10(b)which requires corrective <br /> containment buildings: <br /> Title 22 CCR 66262.34(a)(J) action for all hoz.wasle%oostitueol Post closure requirements apply to releases. <br /> generators for applicable tanks and Tine 22 CCR 67450 3(a)(11)(F}1177 <br /> drip padsand Containment Title <br /> 22 OM 67450,3 c 9 F FIU <br /> buildings.. <br /> Title 22 CCR 66265-197(b) Post closure plan is required for tank <br /> � Past closure is required for tao&s sy <br /> s erns_ <br /> Awilhonl secondary oontainmenl if <br /> all contaminated soils emnot be <br /> removed or decontaminated. <br /> Title 22 CCR 66265.445fc1f 11fBl <br /> Post elasure plan is required for <br /> drip pads(wlo liners)from wood <br /> treatment facititics which do not <br /> comply with liner requirements <br /> Title to 6626993(b)(1). <br /> � Title 222('('ft 66265.11 <br /> c <br /> Post closure is required for <br /> to containment buildings ifall <br /> rn <br /> contaminated soils cannot be <br /> N removed or decontaminated. <br /> cfl <br /> w <br /> 0 <br /> 0 <br /> cs $ <br /> 0 <br /> M <br /> 0 <br /> O <br /> N <br /> to <br /> 0 <br /> N <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.