Laserfiche WebLink
generator may prepare a single multisite review and plan limited to, a selected measure pursuant to subdivision (t), <br /> and plan summary addressing all of these sites. the generator shall amend its review and plan and plan <br /> (e) Every review and plan and plan summary summary to reflect this rejection and include in the review <br /> conducted pursuant to this section shall be submitted by and plan and plan summary proper documentation <br /> the generator for review and certification by an engineer identifying the rationale for this rejection. <br /> who is registered as a professional engineer pursuant to (Amended by Stats. 1993, Ch. 589) <br /> Section 6762 of the Business and Professions Code and <br /> who has demonstrated expertise in hazardous waste 25244.20. (a) On or before September 1, 1991,and <br /> management, by an individual who is responsible for the every four years thereafter,each generator shall prepare a <br /> processes and operations of the site, or by an hazardous waste management performance report and a <br /> environmental assessor who is registered pursuant to hazardous waste management performance report <br /> Section 25570.3 and who has demonstrated expertise in summary documenting hazardous waste management <br /> hazardous waste management.The engineer,individual,or approaches implemented by the generator. <br /> environmental assessor shall certify the review and plan (b) Except as provided in subdivision (e), the <br /> and plan summary only if the review and plan and plan hazardous waste management performance report required <br /> summary meet all of the following requirements: by subdivision (a) shall be prepared for each site in <br /> (1) The review and plan addresses each hazardous accordance with the format adopted pursuant to <br /> waste stream identified pursuant to paragraph (3) of subdivision (a) of Section 25244.16 and shall include all <br /> subdivision (b). of the following: <br /> (2) The review and pian addresses the source (1) The name and location of the site. <br /> reduction approaches specified in subparagraph (B) of (2) The SIC Code for the site. <br /> paragraph (4) of subdivision (b). (3) All of the following information for each waste <br /> (3) The review and plan clearly sets forth the stream identified pursuant to paragraph(3) of subdivision <br /> measures to be taken with respect to each hazardous waste (b) of Section 25244.19: <br /> stream for which source reduction has been found to be (A) An estimate of the quantity of hazardous waste <br /> technically feasible and economically practicable, with generated and the quantity of hazardous waste managed, <br /> timetables for making reasonable and measurable progress, both onsite and offsite, during the current reporting year <br /> and properly documents the rationale for rejecting and the baseline year, as specified in subdivision (d). <br /> available source reduction measures. (B) An assessment of the effect, during the current <br /> (4) The plan summary meets the requirements of year, of each hazardous waste management measure <br /> subdivision (c). implemented since the baseline year, upon the generation <br /> (5) The review and plan and plan summary does not and the onsite and offsite management of hazardous <br /> merely shift hazardous waste from one environmental waste. The report shall consider, but shall not be limited <br /> medium to another environmental medium by increasing to, measures which use all of the following approaches: <br /> emissions or discharges to air, water, or land. (i) Source reduction. <br /> (f) At the time a review and plan or a plan summary (ii) Recycling. <br /> is submitted to the department,the generator shall certify (iii) Treatment. <br /> that the generator has implemented, is implementing, or (C) A description of factors during the current <br /> will be implementing, the source reduction measures reporting year that have affected hazardous waste <br /> identified in the review and plan or the plan summary generation and onsite and offsite hazardous waste <br /> according to the implementation schedule contained in the management since the baseline year, including, but not <br /> review and plan or the plan summary. A generator may limited to, any of the following: <br /> determine not to implement a measure selected in (i) Changes in business activity. <br /> paragraph (5) of subdivision (b) only if the generator (ii) Changes in waste classification. <br /> determines, upon conducting further analysis or due to (iii) Natural phenomena. <br /> unexpected circumstances,that the selected measure is not (iv) Other factors that have affected either the <br /> technically feasible or economically practicable, or if quantity of hazardous waste generated or onsite and <br /> attempts to implement that measure reveal that the offsite hazardous waste management requirements. <br /> measure would result in, or has resulted in, any of the (4) The certification of the report pursuant to <br /> following: subdivision (f). <br /> (1)An increase in the generation of hazardous waste. (c) The hazardous waste management performance <br /> (2)An increase in the release of hazardous chemicals report summary required by subdivision (a) shall be <br /> to other environmental media. completed in accordance with the format adopted pursuant <br /> (3) Adverse impacts on product quality. to subdivision (a) of Section 25244.16, shall provide the <br /> (4) A significant increase in the risk of an adverse information specified in paragraphs (1) and (2) of <br /> impact to human health or the environment. subdivision (b), and a summary of the information <br /> (g) If the generator elects not to implement the required by paragraph (3) of subdivision (b), and shall be <br /> review and plan or plan summary, including, but not certified pursuant to subdivision (f). <br /> Page 165 <br />