Laserfiche WebLink
10. No material to be stockpiled in street or sidewalk. Use of private property shall <br /> be only at permission of property owner. <br /> 11. Traffic control for work within the public right-of-way, including overhead <br /> operations, shall comply with Caltrans Traffic Control Manual, current issue. <br /> Public Streets to remain open at all times. Precautionary measures shall be taken <br /> with construction vehicles and equipment that may create sign-obstruction for <br /> traveling public. One-way traffic requires flaggers present at all times. <br /> 12. If scope of work involves full street closures, detour plan requires submittal to <br /> Traffic Division, Public Works Dept. 333-6706, for approval. <br /> 13.Notify Municipal Service Center, Rich Lenfestey, 333-6740, regarding damaged <br /> or destroyed public water and sewer services and mains; <br /> 14. Boring operations shall require interior video inspection of City underground <br /> facilities crossed by the new installation provided by the applicant at no cost to <br /> the City. Copies of the video tapes will be provided to the City. All potholing to <br /> be kept at a minimum. <br /> 15. All work related utility markings shall be properly removed. Contact Public <br /> Works Inspector for removal information. Necessary work performed by City <br /> forces as a result of failure of proper removal shall be billed; <br /> 16. Access to adjacent driveways to be maintained; <br /> 17. Sedimentation on pavement shall be removed within 24 hours. Street pavement <br /> to be kept in a clean and neat manner. <br /> 18. No obstruction of fire hydrants; <br /> 19. Proper notification of proprietors/residents required prior to start of construction; <br /> access to driveways to be maintained. Applicant shall not disrupt refuse service; <br /> coordination of work schedule with refuse service is required. <br /> 20. Landscaped areas and sprinkler systems disturbed to be returned to a like or better <br /> condition. <br /> 21.New gas mains shall be located along same alignment as existing gas mains. No <br /> offsets are allowed; <br /> 22. Existing gas mains to be abandoned/deactivated shall be removed or new mains <br /> shall be installed below existing mains to be abandoned/deactivated in place; <br /> 23. If trenchless methods are to be used, a Trenchless Installation Plan shall be <br /> submitted at least 14 days prior to anticipated start of work. Plan shall include <br /> information reflecting existing utility locations, pot-holing, information(including <br /> measurements to the top of existing pipelines etc.) <br /> 24. As builts shall be provided to the Public Works Department at completion of <br /> work; <br /> 25. All work and work related activity is to be accomplished in compliance within the <br /> terms of the NPDES guidelines and PM-10 dust control requirements. <br />