Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM ( Page -I of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection ❑ 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181081 9/3/2019 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> FOOD MART GAS Report 2 of 2 <br /> Business Site Address City ZIP Code <br /> 2185 EAST FREMONT STREET ISTOCKTON 95205 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Felix Ramirez 1 (209 ) 744- 0112 <br /> Contractor I Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 08- 1740 Ex . 03/31 /2020 8883072-UT 11 /9/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- FF- EBW , PhikTite & EVR Phase 1 1009883708 EX 11 -29-20 OPW 104-634 Ex 3- 14-2020 <br /> Emco 3147 Ex . 11 - 16-20 VR : B34976 ATG : 7/7/20 Incon 1009883708 Ex 11 -30-20 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify) : VR <br /> Used : <br /> ❑x Industry Code or Engineering Standard (Specify) : BALL FLOATS <br /> ❑ Engineered Method (Specify) : <br /> Pages Attach the inspection procedures and all documentation required to determine the results. # of Attached 4 <br /> TANK ID : (By tank number, stored product, etc.) 87 91 DIESEL <br /> What is the tank inside diameter? (Inches) 113 . 75 113 . 75 113 . 75 <br /> Is the fill piping secondarily contained ? ❑x Yes ❑ No x❑ Yes ❑ No ❑X Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained ? ❑x Yes ❑ No ❑x Yes ❑ No R Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) BALL BALL BALL <br /> FLOAT FLOAT FLOAT <br /> What is the overfill prevention equipment response ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> when activated ? ❑x Restricts Flow X Restricts Flow Z Restricts Flow ❑ Restricts Flow <br /> (Check all that apply.) <br /> ❑ A/V Alarm ❑ A/V Alarm ❑ A/V Alarm ❑ A/V Alarm <br /> Are flow restrictors installed on vent piping ? x❑ Yes ❑ No ❑x Yes ❑ No ❑x Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank.) 102 102 102 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 95 % 95 % 95 % <br /> Is the overfill prevention in proper operating condition ❑x Yes (] Yes Q Yes ❑ Yes <br /> to respond when the substance reaches the <br /> in V. No S eci in V. No (Specify in V. <br />�I <br /> appropriate level ? ❑ No (Specify in V) ❑ No (Specify ) ❑ ( p fY ) ❑ ( p Y ) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results 1�119: Pass El Fail [] Pass ❑ Fail ❑x Pass El Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> ed in this section . An additional comments may alsoPa-providedhere .-- <br /> An items marked "Fail" must be explain y Y � Na <br /> Y <br /> L EIVEU <br /> UT 1 5 2019 <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with Calllfo, ,{Ojpjl OAMAL g4ul `Ctiur�E /TeLtIf12p , <br /> Division 3, Chapter 16 , Section 2637 . 2 and all the information contained herein is accurate. PA n r-r . <br /> UST Service Technician Signature // " � ' y <br /> ( <br /> If the facility has more components than this form accommodates, additional copies of this page maybe attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, AA/ = Audible and Usual <br />