My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 1:02:11 PM
Creation date
7/31/2020 2:24:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z"L CGRS UST Spill Bucket <br /> SOLUTIONS DELIVERED • • <br /> Integrity Testing Form <br /> Underground Storage Tanks ( UST) Program <br /> Instructions on Page 3 <br /> Purpose : This procedure is to test the leak integrity of single - and double-walled spill buckets . See reverse side for <br /> basic hydrostatic testing instructions . Consult PEI/RP1200 , Section 6 . 2 for hydrostatic test method , Section 6 . 3 for <br /> single -walled vacuum test method , and Section 6 .4 for double -walled vacuum test method . <br /> Testing Information <br /> 1 . Tank number 91 89 87 Diesel <br /> 2. Product stored Unleaded Unleaded Unleaded Diesel <br /> 3. Spill bucket capacity 5 Gallons 5 Gallons 5 Gallons 5 Gallons <br /> 4. Manufacturer OPW OPW OPW OPW <br /> ❑ Single-walled [1) Single-walled N Single-walled [E Single-walled ❑ Single -walled ❑ Single-walled <br /> 5. Construction [9 Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double walled <br /> ❑ Hydrostatic i] Hydrostatic ❑ Hydrostatic i] Hydrostatic ❑ Hydrostatic ❑ Hydrostatic <br /> ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum <br /> ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single -walled ❑ Single-walled ❑ Single-walled <br /> 6. Test type ❑ Double walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> ❑ Product [N Product R Product I] Product ❑ Product ❑ Product <br /> 7. Spill bucket type ❑ Vapor ❑ Va or ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor <br /> 8 . Liquid and debris <br /> removed from spill <br /> bucket:* [!] Yes ❑ No 0 Yes ❑ No O Yes ❑ No [9 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> 9. Visual inspection <br /> (No cracks , loose parts or <br /> separation of the bucket <br /> from the fill i e.) ? ❑ Pass ❑ Fail 91 Pass ❑ Fail 11 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 10. Tank riser cap included in <br /> test? 0 Yes ❑ No ❑ NA [5 Yes ❑ No ❑ NA ff] Yes ❑ No ❑ NA 2 Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 11 . Is drain valve included in <br /> test? p Yes ❑ No ❑ NA 0 Yes ❑ No ❑ NA Q Yes ❑ No ❑ NA Q Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 12. Starting level 13.75' 14.00" 13.00" 14.50" <br /> 13. Test start time 8:39 am 8:39 am 8:39 am 8:39 am <br /> 14. Ending level 13.75" 14.00" 12.00" 13.50" <br /> 15. Test end time 9:39 am 9:39 am 9:39 am 9:39 am <br /> 16. Test period 1 hour 1 hour 1 hour 1 hour <br /> 17. Level Chan e 0 0 0 0 <br /> Test results : p Pass ❑ Fail N Pass ❑ Fail ❑ Pass N Fail ❑ Pass N Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only; <br /> Maintain at least 26 inches water column; Vacuum double-walled; maintain at least 12 inches water column. <br /> Comments : <br /> * All liquids and debris must be disposed of properly . <br /> Testing company ICGRS Garrett Warren <br /> name : �� °« Testers name : <br /> Date : M- 2019 Tester's signature : <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.