Laserfiche WebLink
4U1" G2 SAN 10AQUIN <br /> Environmental Health Department <br /> COUNTY Linda Turkatte , REHS , Director <br /> Kasey Foley, REHS, Assistant Director <br /> cgti.F Greatness grows here . PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Michael Kith , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> September 19 , 2019 <br /> MATT THOMAS <br /> CGRS , INC <br /> 5444 DRY CREEK RD <br /> SACRAMENTO , CA 95838 <br /> Re : UNITED #5447 <br /> 1469 E HAMMER LN SR0081071 <br /> STOCKTON , CA 95210 <br /> The San Joaquin County Environmental Health Department ( EHD) has completed the review of <br /> the application for a permit to install direct- bury fill/spill and vapor containers and testable overfill <br /> prevention flapper shut off valves in the 87 , 89 gasoline and diesel tanks on the underground <br /> storage tank ( UST) system at the above noted address . The permit has been approved with the <br /> following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Paul Nso at (209 ) 468- 3432 to arrange the following appointments (a 48 - hour <br /> notice is required for inspection appointments ) . <br /> • Corrosion protection : Verify corrosion protection for direct bury spill buckets prior to <br /> backfilling . <br /> • Spill bucket test : Verify minimum 5 -gallon capacity and pass a one hour hydrostatic <br /> test ( or equivalent) . Proper drainage must also be verified . <br /> • Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume <br /> shut off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> • Verification that ball floats (s ) , if installed , do not interfere with the installed flappers <br /> Valve . <br /> • If concrete will be broken near the 87 , 89 and diesel tanks , a secondary containment <br /> test must be performed on these tanks once concrete is poured in accordance with the <br /> manufacturer' s guidelines and test results submitted to the EHD within 30 days of <br /> testing . <br />