Laserfiche WebLink
BELOW GROUND PRODUCTS www. opwgiobal . com <br /> OPW 71 SO Overfill Materials �! Important <br /> Prevention Valves In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARE - certified OPW 71 SOStorage Tank (UST) , properly <br /> Float : Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of tight-fill adaptor are essential . <br /> underground storage tanks by providing Seals : Viton ® Delivery personnel should <br /> be managed and trained <br /> a positive shut- off of product delivery. Upper & lower Drop Tube : Aluminum to inspect delivery elbows <br /> The shut- off valve is an integral part of Plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . missing parts. They should <br /> Hardware : Stainless steel dciq � always make certain there <br /> The OPW 71 SO allows easy installation VC? is a positive connection <br /> (without breaking concrete) and requires Features ,r, between the adaptor and <br /> no special manholes . A elbow. If delivery equipment <br /> ♦ Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two - Installation — no excavation or or the elbow is not securely <br /> stage shut- off valve. When the liquid special manholes required . coupled the adaptor, a <br /> P q � serious sppill may result when <br /> level rises to about 95 % of tank ♦ Economical — costs a fraction the OPW 71 SO closes, causing <br /> capacity, the valve mechanism is of expensivecomplicated and a hazard and environmental <br /> , <br /> released, closing automatically with contamination . <br /> the flow. This reduces the flow rate to difficult-to - install valves . <br /> ♦ Furnished Complete — supplied approximately 5 gpm through a bypass p NOTE : The OPW 71 SO is <br /> upper and lower drop tubes, designed for use s tight-fill <br /> valve . The operator may then stop the with new u <br /> PP P gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95 % level , the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform , no resets ® Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . ♦ Quick Drain Feature — <br /> liquid rises to about 98 % of tank ® No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved . <br /> completely. No additional liquid can flow ♦ Will Accept a Dipstick ♦ Best Flow Rate in The Industry * <br /> into the tank until the level drops below <br /> a reset point . for Gauging * OPW Test Lab results <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems. <br /> Authority Having Jurisdiction (AHJ ) and ♦ Completely Automatic faster fill times and reducing <br /> review local , state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness orspeed of response of the <br /> governing shut-off capacity in your P 4& Speeds Delivery Operations <br /> region , as well o take into account delivery attendant for certainty of — product flows unimpeded into <br /> overfill prevention . the tank until the hose " kick " that <br /> other considerations such as extreme <br /> tank tilt . In all cases, the upper tube ♦ Keeps the Top of UST " Dry, " accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6 1 /2 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level . <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines . Installation — in both two -point <br /> EPA requirements . ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation , manholes or <br /> 71 SO Instruction Sheet Order vent piping are required . <br /> Number : H15524PA <br /> Look for this label for <br /> Listings and authentic OPW EVR <br /> ULC t� Approved products. <br /> Certifications Re oiuceslBoard cJsloWo OPW 7150M is EVR Approved for E85 <br />