Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: 3/27/2019 <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) in -tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br />annularspaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring venbtransition sumps; 9) devices monitoring under -dispenser containment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />USTAtonitaring 9itePlan <br />---------r------- - - <br />Site Addres,: Qtasla 7906 N El Dorado Stockton 95210 <br />x� <br />TL F V <br />X x A H <br />P <br />. 87 slave 'j' �. V <br />CA <br />X <br />P A. <br />3.1. <br />. nap ape. <br />a. a7aapa . Pipe %FV A <br />x <br />1111 x x ..1011....... <br />6. ._.. 0. <br />................................ ...1111. TL > <br />x xP <br />KEY <br />A=APL\'ULAR <br />F = FILLS aPIPL\G = <br />T = TL74BL`iE (ARROWS) <br />P = PROBE Dtaning of <br />V = VAPOR pipinz exit of <br />%= Since SFSTSOR . - - • sump and UDC's. <br />L=LeakDetertor No underground <br />. 1111...-1111 1111. 1111.. 1111.. <br />kI=Alantc�v <br />Air: lar are not ii:ibletofircerfj&rzgtclaricimrcaea dEanwei <br />B=Brine Sensor pctlesricrn7opitdenoeiearrinesde� fcrir�aitrrtiararlpragzea_ Drrnring ,We <br />cannot speculate <br />I=SmutSemor ra�ttoscde blue tints. <br />S=STP <br />C =Hosts c@ Chsias <br />E = £ Stop <br />. <br />Date map was drawn03127119 <br />Instr <br />_ <br />EL <br />DORADO <br />R <br />L. <br />N. <br />E <br />uctions <br />It you already have a diagram that shows atl required information, you may include H, rather than this page, with your Monitoring System C=cation. On yeur site plan, <br />show the general layout of tanks and piping. Clearly Iden* locations of the following equipment, N installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sump-, di=-penser pans, spill containers, or other _e:cndary containment areas: mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for teak detection). In the space prerded, note the date this Site Plan was prepared. <br />LEGEND <br />