Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: 3/27/2019 <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring Sy, t� <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipmen <br />if installed: 1) monitoring system control panels; 2) in -tank liquid level probes (if used for leak -detection) 3) devices monitoring 'tank <br />annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) de Vices monitoring vent piping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitdking' under -dispenser conta/ment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />She Address_ <br />UST Monitoring Site Plan <br />Gash 7806 N El Dorado Stockton $5210 <br />1 1 ._U16 0 k 1 0 - 6 4 1 M l 4 x gl TL F V <br />P <br />A <br />87 Slave T F <br />x <br />P <br />nap Bps . <br />Pie F V <br />x x <br />P <br />................................ TL i �' <br />QW <br />x x� <br />KEY <br />F = FILLS +PIPE\G <br />T = TURBL` E (,ARROWS) <br />WS) <br />_ . . . . . Dranringof <br />V = VAPOR piping exit of <br />X=MA PSENSOR wrap andUDC`s. <br />N andergro and <br />L=LeakDetertor <br />11I = TSamr-ar <br />$ =Brine Sensor <br />I = Smart Senior <br />S=STP <br />. o <br />. _ dnn�ing i <br />. _ �, eve <br />cannot speculate <br />blue prints. <br />EL DORADO _ <br />C =Floats �& Chams <br />E=£Stop <br />RI <br />:A <br />Date map was drawn03727119 <br />Instructions <br />If you already have a diagram that shows a➢required information, you may include it, rather than this page, with your fdonitoring System Ceitificazion. On your site plan, <br />chew the general layout of tanks and piping. Clearly'rdentAy locations of the following equipment, if installed: monitoring system control panels; sensors monitoring Tank <br />annular spaces, sumps, dispenser pans, spill containers, or other_ecendary containment areas: mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for teak detection). In the space provided, note the date this Site Plan was prepared. <br />