Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> DESIGNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT ( Page 2 of 2) <br /> VII . INSPECTION HISTORY <br /> Has each follow-up action of Section III from the previous inspection been completed appropriately? Y N <br /> Attach documentation verifying appropriate service to this report. ❑ <br /> Vlll . ALARM HISTORY <br /> Attach a copy of the alarm history report/log to this report. Y N NA <br /> Is the monitoring system powered on and in proper operating mode? 19 ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? ❑ ❑ <br /> Attach documentation veqWpg appropriate service to this report. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a ❑ ❑ <br /> qualified UST Service Technician ? <br /> List below in Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified UST Service Technician. Containment sumps listed below require a visual inspection for damage, water, debris, <br /> hazardous substance, and proper sensor location. The results of the visual inspection must be recorded in Section IX. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage , water, debris , and hazardous substance? <br /> Containment Sump ID Y N Containment Sump ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage , water, debris, and hazardous substance? <br /> Tank ID I F 7 1 M1 ❑ TanklD ❑ ❑ <br /> Tank ID Liz ❑ 1 Tank ID ❑ ❑ <br /> Is the fill pipe free of obstructions? <br /> Tank ID 7 ❑ Tank ID I 01 ❑ <br /> Tank ID / 01 Tank ID ❑ ❑ <br /> Is the fill cap securely on the fill pipe? <br /> Tank ID 1 .97 01 Tank ID 1 ❑ ❑ <br /> Tank ID W1 ❑ anID [I ❑ <br /> Is the under-dispenser containment free of damage , water, debris , and hazardous substance? <br /> Under-Dispenser Containment ID Y I N INAI Under-Dispenser Containment ID Y N NA <br /> Dispenser 1 /2 ❑ ❑ Dispenser 3/4 ❑ ❑ <br /> Dispenser 5/6 ❑ ❑ M Dispenser 7/8 ❑ ❑ <br /> Dispenser 9/10 ❑ ❑ J 9 Dispenser 11 /12 ❑ ❑ <br /> ❑ ❑ <br /> 13 El ❑ ❑ <br /> 171 El❑ ❑ 1:1 11 )9 <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? El <br /> X. TESTING AND MAINTENANCE YLN NA Date LastPerformed <br /> Has the monitoring system certification been completed within the past 12 months? lfm/yam /Has the spill container testing been completed within the past 12 months?Has the overfill prevention equipment inspection been completed within the past 36 months? ❑ ❑ <br /> Has the secondary containment testing been completed within the past 36 months? ❑ ❑ 9 2y <br /> I Has the tank tightness testing been completed within required timeframes? ❑ IR ❑ <br /> Has the line tightness testing been completed within the required timeframes? ❑ ❑ <br /> Other required testing / maintenance was completed within required timeframe. (List test/maintenance items below.) <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test ! Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> XI . FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? El <br /> I the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> Y = Yes, N = No, NA = Not Applicable, ID = Identification <br /> UN -111 www.unidocs .org 2/2 - Rev. 06/14118 <br /> i <br />