Laserfiche WebLink
Underground Storage Tank System Designated UST Operator Monthly Inspection Report — Page 2 of 2 <br /> Comments : <br /> Required Follow-Up Actions : <br /> /Uo cAAJ U t R-dM <br /> i <br /> I <br /> E <br /> INSTRUCTIONS <br /> 1 . The monthly UST system inspectiowmust be conducted by a Designated UST Operator who possesses a current "California <br /> UST System Operator" exam issued by the International Code Council ( ICC) . <br /> 2 . The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during the monthly visual <br /> inspection that may require follow-up actions . <br /> 3 . A copy of this monthly inspection report must be provided to the UST Owner or Operator. <br /> 4 The UST Owner or Operator must maintain a copy of each monthly inspection report and all attachments for the most recent <br /> 12 months . The records shall be maintained on-site or, if approved by the local agency, off-site at a readily available <br /> location . <br /> UN-057 - 2/2 www.unidoes.org 9/26/05 <br />