My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 11:15:30 AM
Creation date
7/31/2020 3:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> DESIGNATED UNDERGROUND STORAGE TANK OPERATOR VISUAL INSPECTION REPORT (Page 2 of 2) <br /> VII . INSPECTION HISTORY <br /> Has each follow-up action of Section III from the previous inspection been completed appropriately? Y N <br /> Attach documentation verifying appropriate service to this report. PEI 1 ❑ <br /> Villa ALARM HISTORY <br /> Attach a copy of the alarm history report/log to this report. Y N NA <br /> Is the monitoring system powered on and in proper operating mode? ❑ ❑ <br /> Has each leak detection alarm since the previous inspection been responded to appropriately? ❑ ❑ <br /> Attach documentation verifying appropriate service to this re ort. <br /> Have all containment sumps that have had a leak detection alarm since the previous inspection been responded to by a ❑ ❑ <br /> qualified UST Service Technician? <br /> List below in Section IX all containment sumps that have had a leak detection alarm since the previous inspection and have not been <br /> responded to by a qualified UST Service Technician. Containment sumps listed below require a visual inspection for damage, water, debris, <br /> hazardous substance, and proper sensor location. The results of the visual inspection must be recorded in Section IX. <br /> IX. UNDERGROUND STORAGE TANK SYSTEM INSPECTION <br /> Is the containment sump free of damage, water, debris , and hazardous substance? <br /> Containment Sump ID Y I N Containment Sump ID Y N <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ 11 <br /> 11 ❑ ❑ <br /> Are all sensors in containment sumps inspected located to detect a leak at the earliest opportunity? ❑ ❑ <br /> Is the spill container free of damage, water, debris, and hazardous substance? <br /> Tank ID 187 ❑ I W Tank ID ❑ ❑ <br /> Tank ID 191 ❑ 1XI Tank ID I ❑ ❑ <br /> Is the fill pipe free of obstructions? <br /> Tank ID 187 ❑ Tank ID ❑ ❑ <br /> Tank ID 191 [11 Tank ID ❑ ❑ <br /> Is the fill cap securely on the fill pipe? <br /> Tank ID 187 ❑ Tank lD ❑ ❑ <br /> Tank ID 191 IX 01 Tankll) ❑ ❑ <br /> Is the under-dispenser containment free of damage, water, debris , and hazardous substance? <br /> Under-Dispenser Containment ID Y I N I NAI Under-Dispenser Containment ID Y N N <br /> Dispenser 1 /2 ❑ ❑ ❑ ❑ 0 <br /> Dispenser 3/4 10 ❑ ❑ ❑ B <br /> ❑ 0 ❑ ❑ 0 <br /> ❑ ❑ o ❑ ❑ a <br /> ❑ ❑ 0 01019 <br /> ❑ ❑ o 01010 <br /> Are all sensors in under-dispenser containment located to detect a leak at the earliest opportunity? )ff ❑ ❑ <br /> Date <br /> X. TESTING AND MAINTENANCE Y N NA Performaed <br /> Has the monitoring system certification been completed within the past 12 months? D ❑ _ 8/14/2018 <br /> Has the spill container testing been completed within the past 12 months? 0 ❑ 8/14/2018 <br /> Has the overfill prevention equipment inspection been completed within the past 36 months? ❑ ❑ <br /> Has the secondary containment testing been completed within the past 36 months? © ❑ ❑ 8/29/2018 <br /> Has the tank tightness testing been completed within required timeframes? ❑ ❑ ❑ <br /> Has the line tightness testing been completed within the required timeframes? ❑ ❑ ❑ <br /> Other required testing / maintenance was completed within required timeframe. (List test/maintenance items below.) <br /> I Test / Maintenance : AQMD Annual Test ❑ ❑ <br /> Test / Maintenance : 4 ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance: ❑ ❑ <br /> Test / Maintenance : ❑ ❑ <br /> Test / Maintenance : 1 /16/19 ❑ ❑ <br /> XI. FACILITY EMPLOYEE TRAINING Y N <br /> Have all individuals performing facility employee duties received the required facility employee training within the past 12 months? ❑ <br /> I the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> Y = Yes, N = No, NA = Not Applicable, ID = Identification <br /> UN -111 www.unidocs.org 212 - Rev. 06/14118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.