restricted access to the product and the site. This limited war- Torque Specification :
<br /> ranty also shall not apply to any product which has been al- Spill Container 4" NPT, 125 ft-lbs minimum to 250 ft- lbs max-
<br /> tered in any way, which has been repaired by anyone other
<br /> than a service representative authorized by OPW, or when imum.
<br /> failure or defect is due to: improper installation or mainte- 4" Nipple : 4" NPT, 125 ft-lbs minimum to 250 ft-lbs maxt-
<br /> nance ( including, without limitation, failure to follow Flex- mum .
<br /> Works Quick Reference Manual Installation Guide and all NOTE : All 4" NPT threads are to be torqued progressive-
<br /> product warning labels); abuse or misuse; violation of health ly lower from the tank up.
<br /> or safety requirements; use of another manufacturer's, or Drain Valve clamps : 5/ 16- 18 UN thread, 11 .5 ft-lbs minimum
<br /> otherwise unauthorized, substances or components; soil or
<br /> other surface or subsurface conditions; or fire, flood, storm, to 13 . 5 ft-lbs maximum ,
<br /> lightning, earthquake, accident or any other conditions, Nipple Adaptor Bolts : 3/8- 16 UN, 20 ft-lbs minimum to 25 ft-
<br /> events or circumstances beyond OPW's control . lbs maximum .
<br /> THIS LIMITED WARRANTY IS IN LIEU OF ALL OTHER WARRAN- Inner Ring and Lower Bellows Ring Bolts : 3/8 16 UN, 15 ft-
<br /> TIES, EXPRESS OR IMPLIED, AND ALL OTHER WARRANTIES lbs minimum to 20 ft4bs maximum .
<br /> INCLUDING, WITHOUT LIMITATION, THE WARRANTIES OF Tools Recommended:
<br /> MERCHANTABILITY AND FITNESS FOR A PARTICULAR PUR-
<br /> POSE, ARE HEREBY EXCLUDED. 1 -3100-TOOL Torque Installation Tool
<br /> OPW shall have no other liability whatsoever, whether based DW-VAC-TEST - Vacuum Test Equipment
<br /> on breach of contract, negligence, gross negligence, strict SC-TEST-Sealable Test Cover
<br /> liability or any other claim, including, without limitation, for DPW 1 -2200 SERIES GRADE LEVEL SPILL CONTAINER
<br /> special, incidental, consequential or exemplary damages or INSTALLATION INSTRUCTIONS :
<br /> for the cost of labor, freight, excavation, clean -up, downtime,
<br /> removal, reinstallation, loss of profit, or any other cost or Step 1 : (See Figures 1 and 2)
<br /> charges . No person or entity is authorized to assume on be- Determine riser pipe height. "L" is the distance between
<br /> half of OPW any liability beyond this limited warranty. This the top of the riser pipe and finish grade.
<br /> limited warranty is not assignable. NOTE: The spill container height (from riser to grade) is
<br /> ** Date of manufacture on this product is located on the L + 1
<br /> inner ring of the bucket.
<br /> In some states it is prohibited to use spilt container drain
<br /> Model Series " L" Dimension
<br /> valves on spill containers that are exclusively used for vapor 5 Gal . (Cast Iron Base) L = 15 5/8 " (40 cm)
<br /> return risers . Install only 1 -2200 Series Thread -On spill con-
<br /> 15 Gal . (Cast Iron Base) L = 17 3/8" (44 cm)
<br /> tainer models equipped with a drain plug .
<br /> WARNING: If the inner ring, lower bellows ring, bellows, or Step 2 :
<br /> base is removed for any reason, follow the Operation and
<br /> Maintenance instruction as noted . Replace o-rings and seals De-burr and thoroughly clean riser pipe. Apply pipe
<br /> and install new ones . Never reuse damaged o-rings or seals dope to riser threads. Pipe dope is to be a non -
<br /> an it may result in an improper seal . Only qualified, compe- hardening, gasoline resistant pipe thread seal comm
<br /> tent, well-trained technicians should perform maintenance. pound .
<br /> Common sense and good judgment should always be exer- NOTE: Ground riser pipe to nearest grounding rod.
<br /> cised . The contractor's understanding of all related site con -
<br /> ditions prior to starting the project is essential . If the con- Step 3 :
<br /> tractor does not have a clear understanding of the required Install spill container by rotating the mounting ring until
<br /> work and site conditions, the contractor is advised to seek hand tight.
<br /> clarification prior to starting any portion of the project. NOTE: Do NOT attempt to completely tighten the con-
<br /> NOTICE TO DELIVERY DRIVER: All delivery drivers MUST tainer using the mounting ring. Doing so may cause the
<br /> inspect the inside of the container for water or contami- unit to fail.
<br /> nants other than fuel prior to delivery. If water or contami-
<br /> nates are present, then they MUST be removed before pro Step 4 : (See Figure 2)
<br /> ceeding . Dispose of towels and debris safely and per all ap- Finish tightening the spill container base using the
<br /> plicable local, state, and federal codes . After delivery is comm wrenching boss or with the 1 -3100-TOOL. Torque to 125
<br /> plete, the driver MUST drain any excess fuel that may have ft-lbs min . to 250 ftdbs max (4" NPT) . 1 -3100-TOOL can
<br /> spilled into the container from their delivery hose. be used to set final torque (see 1 -3100-TOOL instruc-
<br /> t -2200 Series Performance Specifications: This Spill Con- tions) . NOTE : Per PEI RP100 Section 5 . 11 , support the
<br /> tainer drain valve has been manufactured and tested to the spill container after installing before backfilling .
<br /> following specifications : Leak Rate to be less than or equal
<br /> to 0 . 17 CFH @2 .0 " W.C.
<br />
|