My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOWELL
>
1975
>
2300 - Underground Storage Tank Program
>
PR0232521
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2022 11:08:45 AM
Creation date
8/3/2020 11:09:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0232521
PE
2361
FACILITY_ID
FA0004044
FACILITY_NAME
TRACY USD - SERVICE CENTER
STREET_NUMBER
1975
Direction
W
STREET_NAME
LOWELL
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23213008
CURRENT_STATUS
01
SITE_LOCATION
1975 W LOWELL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
waste. If the leak cannot be corrected the spill contain- Height Adjustment Bolt <br /> er or bellows should be replaced. <br /> As an alternate to a hydrostatic test a vacuum test can be <br /> performed on the spill container. Using OPW DW-VAC- <br /> TEST and SC-TEST, perform a vacuum test on the spill con- <br /> tainer. An initial vacuum of 15 " of water should be attained <br /> and the spill container must retain a vacuum of at least 12 " �-- Shims <br /> of water after 5 minutes. (See DW-VAC-TEST Instructions.) <br /> Cap --i� <br /> Step 9: (See Figures 2 & 5) <br /> Before pouring concrete, place plastic over the cover and <br /> Mounting Ring protecting them from concrete splash . Adaptor <br /> Double check that the unit is level and at proper grade <br /> height. Pour concrete per Figure 5 . Ramp or dome the Figure <br /> concrete away from the mounting ring . <br /> There should be a minimum of 1 " slope to finish grade . <br /> Slope 1 " Down From Top of Mounting Ring <br /> NOTE: Do nor stand on spill container before concrete sets <br /> UPS Finish Grade <br /> Remove plastic from cover after concrete has dried . Remove <br /> adjustment system . Re-test the spill containers for leaks as :' e �. 4 , • .. <br /> described in Step 8, after the concrete has set up. - ' "'' ' <br /> 14 1 <br /> Operation and IwalntenaDce: v • • . a ,. v • . : a : : . . .- a ,, <br /> ♦ 1 . . '' .��d a ♦ . 4q'+� a i idly q I • 4o+a <br /> After each fuel delivery, the operator must remove any stand- • IF, <br /> Ing fuel from the container. Fuel can be removed by actuat- • Z ' " ' rIF k <br /> ` <br /> ing the drain valve or with a gasoline absorbing disposable :' •�• ; :°' ° ' ` 4i ' ' ; 4 4 ' \•�' <br /> g 9 P tee . . � q . � <br /> towel . If access to drop tube or overfill valve is required re- , %\ r e • a o ; ® " <br /> move Nipple Adaptor from primary bucket. \ a d v D <br /> 10 P <br /> Weekly: Perform a visual inspection of the interior of the con- <br /> tainment bucket for water or other contaminants. If water or <br /> other contaminants are found they must be disposed of with Figure s <br /> disposable towels. Dispose of towels safely and per all appli- <br /> cable local, state and federal codes. Check that cover is in <br /> good condition and properly identified. Replace cover and , r <br /> seal as necessary. Inspect the bucket walls for cracks, bulges i1; _ i <br /> IF <br /> or holes. If any exist, have that spill container barricaded and r Min Clearance ! <br /> contact maintenance personnel immediately for repairs. <br /> NOTE: The bellows and base on the spill container can be ; <br /> replaced if damaged. ° ` - <br /> JIi _ a, - i , <br /> Semiannually: Follow all state and local required hydrostatic ' _ B <br /> or vacuum testing on the buckets. Inspect and clean the inte- t <br /> rior of the spill container and drain valve screen . Remove ac- r ' ,q <br /> cumulated dirt and grit. Where applicable, test the drain it <br /> valve using CARB procedure TP-201 . 1 C or TP-201 . 1 D. If the 171 " <br /> drain valve passes testing no further maintenances required . If r Ref <br /> the drain valve fails testing, remove the valve, soak in water . <br /> and use high-pressure air, if needed, to clean. Reinstall the <br /> drain valve to its proper position and where applicable, test F - <br /> the valve with CARB procedure TP-201 . 1 C or TP-201 . 1 D. If - - _,,_____„� <br /> problems persist, replace the drain valve with P/N 1 DK-2100- <br /> EVR (specified torque 11 .5 ft-lbs min to 13 ,5 ft-lbs max, 5/ 16- <br /> 18 UN thread) . The sealable cover ( 1 SC) adjustment nut is set <br /> at the factory, but due to environmental conditions it may be <br /> necessary to adjust it to either improve sealing or ease cover LLength of Nipple = Dimension A - Dimension B - Dimension C • 2" twin <br /> removal . Figure 6 <br /> IMPORTANT: Leave these instructions with the Station <br /> Operator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.