2.3 Test Chronology <br /> The system was installed under the direction of .the manufacturer on May 20, 1999. The <br /> infiltrationlexfiltration test was completed on May 21, 1999. The plant was filled with 213 fresh water and 113 <br /> raw sewage and then dosing was initiated at the rate of 600 US gpd, beginning May%21: Sampling was <br /> started..on May'25, 1999. The stress test sequence was started on September.13 ander on NoKembar <br /> 3, and testing was completed on November 19, 1999. <br /> On July 26, visual inspection indicated that mixing>in the second aeration charnbar had ceased, although <br /> air could still be seen bubbling up. The diffuser at the bottom of the chamber-was'pr'obed to check on its <br /> condition,which appeared to restart mixing. Approximately 2.5 ft3 of media was removed from the second <br /> chamber, and was not replaced for the duration of the test. <br /> On August 10, the plant was found to be in a flooded condition. A blownfusecaused Ow"discharge pump <br /> to fail over night, resulting in a high liquid level in the plant. The fuse was replaced and the plant operation <br /> was not otherwise. affected. Approximately'2:5 ft3 of media:had been transferred over the baffle,wall <br /> between the second aerakv chamber and the secondary darifierchamber during the high level condition. <br /> This was discovered-at the end of testing during a detailed inspection of the system: <br /> Inspection of the piant.oa.September 10, 1999, found the plant had riot been dosed in about 20 hours due <br /> to a computer programming error. The program was,reset,and-normal dosing col rued. <br /> 3.0 ANALYTICAL RESULTS :. <br /> 3.1 Summary <br /> Chemical analyses of samples c oiected during #**valuation were completed using the pFocedures in <br /> Stand"Methods for do Examination of Water.and Wastewater3 and USEPA inethods.' Copies of the datk <br /> generated;during the evaluation are induded•WAppendix C. Results of'the cherrtical analyses and on-site <br /> observations and measurements made during the evaluation are summarized In Table I, <br /> Criteria for evaluating:the amlytical results from the testingiare.-described in Section 9.5 of ANSUNSF <br /> Standard 40. In completing the passlfail determination for the data, an allowance is made for effluent <br /> suspended solids and CBOOs during the first,month of testing. ,The'30 and 7 day averages during this time <br /> may not equal or exceed 1.4 times the effluent limits required for the rest of the'test.- Thisprovlsiorr <br /> recognizes that an immature culture of microorganisms within the system may require additional time to <br /> achieve adequate treatrnentaf ciency. Effluent from the EnviroServer 600 during thwfirst calendar month <br /> of testing was within the normal limits and did not need to use this provisign., <br /> 99/1$12016AM This report may not be reproduced in whole or In pert ,10 of 49 <br /> Final Report without the expressed written consent of N9F.Wdemational. A0dI 20Db <br />