My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
23833
>
4200 – Liquid Waste Program
>
PR0516930
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 9:22:11 AM
Creation date
8/5/2020 10:01:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516930
PE
4242
FACILITY_ID
FA0012932
FACILITY_NAME
NAVARRA BROS
STREET_NUMBER
23833
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25014014
CURRENT_STATUS
01
SITE_LOCATION
23833 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\C\CHRISMAN\23833\PR0516930\INSPECT CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> the first two dosing periods per day,the design loading During the 6-month toting'and evaluation, a total of 3 <br /> shall include 3 wash loads (3 wash cycles and 6 rinse effluent samples shall be assessed for color,odor,foam, <br /> cycles)• and oily flim. The assessments shall be conducted on <br /> effluent composite samples selected randomly during the <br /> 9.2.2.2.2 Working-parent stress.: fit phased deftn*401g:(weeks 1-16),the period of <br /> s#W$,,loadkV (weelw 47-23.5), and the second phase <br /> • Fca-5;consecutive days,the system be subjected to of design,loading(weeks 23.5-26). <br /> a wig-parent stress.:During this idress, the system <br /> shall be dosed with 40% of its daily hydraulic capacity 9.3 Sample collection <br /> beipreen 6:00 a.m. and 9Wla.m. Between 5:00.p.m. <br /> and 8:00 p.m., the system shall be dosed .with the 9.3.1 General <br /> remaining 60%of its daily hydraulic capacity,which shall <br /> include 1 wash load(1 wash cycle and'2 rinse cycles). 9.3„1.1 A minimum bf 96 data days shall be:required <br /> during-system performance testing and evaluation. No <br /> 9.2.2.2.3 Power/Equfpfnent failure stress` routine service or maintenance shall be performed on the <br /> system whether the time period to achieve the 96 data <br /> The system shall be dosed with 401°16 of its daily hydraulic days falls within or exceeds 6 months. <br /> capadty between 5:00 p.m.and 8.100 p-m.on the'64 the <br /> po lequiprnent failure stress`is IhId Ited. Power to the 9.3.4.2 : :Ail; sampib collection methods shall be in <br /> system shall then be turned off at 9,00 p.m. and d.Osing accordance .wfth.-APHA's.S'tandard Methods for the <br /> shall be discontinued for 48"hours. �4ft8r'48 hours,power Exemtination of Water and Wastewafer unless otherwise <br /> shell be iestored and the systeri`i shall be dosed over a specified. <br /> 3 hour period with 80% of its daijr hydraull capacity; <br /> which shall Include 1 waslti Ioad"(1 wash`cycle and 2 9.3.1.3 Influent wastewater samples shall be flow- <br /> rinse cycles), proportional,24-hour composites obtained during periods <br /> of system dosing. Effluent samples ,shall be flow- <br /> 9.2.2.2.4 Vacation stress proportional,24-hour composites obtained during periods <br /> of system discharge. <br /> On the day that the vacation stride' is initiated, the <br /> system shall be dossed at 36t of Jit§ daily hydraulic 9.3.2 Design loading <br /> capacity between 6:00 a.m. and 9,00 a.m. and at 25% <br /> between 11:00 a.m.and 2-00 p.m. osinglial then be During periods of design leading,daily composite effluent <br /> discontinued for 8 cortsecxtive tlays '(power shall samples shalt be collected and analyzed 5 days a week. <br /> continue"fio be suppited to the system. Between 5:00 <br /> p.m.and 8:00 p.m of thei-ninth clay;the system shall be' 9.3:3. Stress loading <br /> dosed with 60% of"its daily hydrsullo 6aoaty, whldh <br /> shall Include 3 wash loafs' (3 wash cycles and 6r1hse During stress ksadingi"Jnfluent and effluent 24-hour <br /> des) composite samples shall be collected on the day each <br /> strm.condition is initiated. Twenty four hours after the <br /> i+�t <br /> compan of wash-day, working-parent, and vacation <br /> stressee,,,Anfluwt: and eAtcrent 24-hour composite <br /> 9.2.3- Dosing volumes samplowAhall be collected for 6 consecutive days. Forty <br /> eight hours after the cornpladon of the power/equipment <br /> The 30-day average volume of therastewater delivered failure stress, influent and efliuent 24-hour composite <br /> to the system shall be within'100%1.16%orthe system's samples shall be collected for 5 consecutive days. <br /> rated hydraulic capacity. <br /> 9.4 Analytical descriptions <br /> NOTE - All dosing days, except those with dosing <br /> MquiOwnerds less than the der tiy&uulft"capadty,shall be 9.4.1 pH,TBS,and CBOD, <br /> i ducted In the 30-day average calculathn. <br /> The pH, TSS, and CBODS of the collected influent and <br /> 9.2.4 Calor,odor,foam,and oily film assessments went 24-hour composite samples shall be determined <br /> with the appropriate methods in APHNs Standard <br /> Methods for the Examination of Wafer and Wastewater. <br /> This reportmray not be reproduced In whole or inpert Page 29 of 49 <br /> Final-Report without the expressed written consent of NSF Intematlor*l. April 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.