My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_NL STDY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
23833
>
4200 – Liquid Waste Program
>
PR0516930
>
COMPLIANCE INFO_NL STDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 9:22:10 AM
Creation date
8/5/2020 10:01:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
NL STDY
RECORD_ID
PR0516930
PE
4242
FACILITY_ID
FA0012932
FACILITY_NAME
NAVARRA BROS
STREET_NUMBER
23833
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
25014014
CURRENT_STATUS
01
SITE_LOCATION
23833 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\4200 - Liquid Waste\C\CHRISMAN\23833\PR0516930\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rCI.-I,oANTZSCMEIFINNEMOREE UATIONFOR REMAINING 39% OF <br /> NVENTIONAL SEPTIC SYSTEM WASTEWATER <br /> INw(1 - d) +RNb <br /> Nr= (I+R) <br /> Values and Assumptions <br /> I= 435 gal/d x 260 d/yr= 113,100 gals =conventional WW/yr= 15,120 cu ft = 0.55 in. <br /> 7.53 Ac x 43,560 sq ft/Ac = 328,007 sq ft <br /> Nw = 103 mg NIL: 20% reduction from septic tank+ 10% removal from biomat= 74 mg NIL <br /> d = Assume 30% <br /> R = 10 in/yr. But 80% of total area covered w/roofs and asphalt .•. 2 in/yr. <br /> Nb= Assumed to be 0.1 ppm NO3-N <br /> y 0.55 in/ 74 mg NIL (1 - 0.30)(2 in/yr x 0.1-mgU <br /> Nr = (0.55 in/yr+ 2 in/yr) <br /> b <br /> Nr = 11.3 ppm as nitrate-nitrogen (NO3-N) or 50.6 ppm as nitrate (NO3) <br /> PREDICTED NITRATE-NITROGEN LOADINGFROM COMPLETED PROJECT OF 61% <br /> TREATED WASTEWATER AND 39% CONVENTIONAL SEPTIC SYSTEMS FLOWS: <br /> 1.2 ppm NO3-N+ 11.3 ppm NO3-N= 12.5 ppm NO3-N in comparison to the entire project on <br /> conventional septic systems: 12.5 ppm NO3-N vs'. 21.5 ppm NO3-N(42%reduction) <br /> C. SEPTIC SYSTEM COMPONENTS <br /> The design of a fixture septic system for the facility is based upon the factors of operation, <br /> longevity, and environmental protection. The Sari Joaquin County Environmental Health <br /> Department will stipulate design requirements for`environmental protection. <br /> SEPTIC TANKS <br /> Since development north of Carmelo Avenue is on six separate septic tanks and leachfields, <br /> 4 septic tank design criteria can only be establish or existing and proposed development south <br /> of Carmelo Avenue. The following septic tank volume criteria is based on conventional systems, <br /> and may or may not apply to the proposed MicroSepTec® wastewater treatment system. <br /> Chesney Consulting <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.