Laserfiche WebLink
Kennedy/Jenks Consultants <br /> Memorandum <br /> John Marlow, Owner <br /> 1 April 2009 <br /> Page 4 <br /> Pressure Recorders and Alarms: <br /> The EHD by letter of July 2008 required the installation of pressure recorders and alarms for the 60 <br /> day demonstration pilot plant tests conducted last fall, and these were continued for the <br /> demonstration test of February. <br /> It is not understood why the maintenance and operation of this equipment is necessary on a <br /> continuing basis, or is it usual for small water systems. <br /> gya:t:u:W�aanznyo0.510;Aii:tl09a islmCnmiiWandnepal'fJitin:sn9wve.'tn ee.'menmanpum-Ydhn nwWsv 04 0�090dc ©Nsnsd9.,Jen:s f.,.:sviti+•:inc <br />