Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): ctt. <br />1:1 1. VERBAL WARNINGS; • 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; 0 3. TELEPHONE; <br />CI 4. PAGERS; • 5. ALARM SYSTEM; • 6. PORTABLE RADIO <br />NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): C12. <br />SYSTEM; 0 3. TELEPHONE; <br />0 1. VERBAL WARNINGS; • 2. PUBLIC ADDRESS OR INTERCOM <br />04. PAGERS; • 5. ALARM SYSTEM; • 6. PORTABLE RADIO <br />EMERGENCY COORDINATOR CONTACT INFORMATION: JON WILLIAMS <br />i 13 <br />PRIMARY EMERGENCY COORDINATOR NAME: JON WILLIAMS PHONE NO.: (209) 652-1634 PHONE NO.: <br />ALTERNATE EMERGENCY COORDINATOR NAME: ATHENA LARUE PHONE NO.: (209) 599-8300 PHONE NO.: <br />0 Chcck if additional Emergency Coordinator contact and address information is available onsitc or by calling PHONE NO.: <br />Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases, fires and/or explosions. DI <br />0 I. MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP. ETC.: <br />0 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls. built-in berms); <br />0 3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g.. Pads, spill pigs. spill pillows); <br />4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS: <br />El 5. LINED TRENCH DRAINS AND/OR SUMPS; <br />0 6. AUTOMATIC FIRE SUPPRESSION SYSTEM: <br />0 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS: <br />0 8. STOP PROCESSES AND/OR OPERATIONS; <br />0 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />0 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br />0 11. CALL 9- I-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br />O 12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />0 13. ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br />El 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM: <br />0 is. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />O 16. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />0 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />CONTROL AND/OR CLEANUP; 18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL <br />0 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br />0 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br />ID 21. OTHER (Specify): <br />D2 <br />E. FACILITY EVACUATION <br />THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): El. <br />0 I . BELLS; <br />EL'. <br />2. HORNS/SIRENS: <br />0 3. VERBAL (i.e., Shouting); <br />1:1 4. OTHER (Specify): <br />THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g.. Parking lot, street corner): D. <br />Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4 <br />0 I. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS. AND ASSEMBLY AREAS; <br />0 2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS. AND ASSEMBLY AREAS: <br />0 3. OTHER (Specify): E5. <br />Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): FL <br />0 1. HAVE BEEN DETERMINED NOT NECESSARY; F2. <br />0 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />Note: Advance arrangements with local fire and police departments. hospitals. state and local emergency response teams, and/or emergency services <br />contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br />Rev. 03/07/17 <br /> Page 2 of 4