My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006621
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1012
>
3500 - Local Oversight Program
>
PR0545948
>
ARCHIVED REPORTS_XR0006621
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:19:51 PM
Creation date
8/5/2020 4:02:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006621
RECORD_ID
PR0545948
PE
3528
FACILITY_ID
FA0005159
FACILITY_NAME
FILL-EM FAST
STREET_NUMBER
1012
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21903024
CURRENT_STATUS
02
SITE_LOCATION
1012 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-3 <br /> . Specific conductance ±10 percent of the reading range <br /> • pH ±0.1 pH unit <br /> • Temperature ±0 S° C <br /> After stabilization, and after at least three well volumes are evacuated, a sample will be collected <br /> for analysis The field container used for well stabilization measurements, and the pH, <br /> temperature, and conductivity probes will be rinsed between wells with detonized water <br /> All purge water will be containenzed and properly handled and documented for disposal if the <br /> containers are stored on site, a label specifying the date of purging, source, and the known or <br /> suspected nature of the contents will be affixed to each container. <br /> 2.3 Sample Collection, Preservation, and Handling <br /> After purging, a new polyethylene disposable bailer will be used to collect samples for analysis <br /> The bailer is attached to a new disposable rope and lowered slowly into the water to avoid <br /> agitation of the collected sample Containers for volatile organics analyses will be filled <br /> completely so that no airspace remains in the vial after sealing <br /> All sample containers will be prewashed and prepared at the analyzing laboratory in accordance <br /> with quality assurance/quality control protocols of the laboratory Only sample containers <br /> appropriate for the intended analyses will be used. <br /> 3.0 DECONTAMINATION AND DISPOSAL PROCEDURES <br /> 3.1 Equipment Decontamination <br /> All equipment that comes in contact with potentially contaminated soil, dnlling fluid, air, or <br /> water will be decontaminated before each use Decontamination will consist of steam-cleaning, <br /> a high-pressure, hot-water rinse, or trisodium phosphate (TSP) wash and freshwater rinse, as <br /> appropnate. <br /> Drilling and sampling equipment will be decontaminated as follows <br /> 1 Drill ng augers, drill rods, and drill bits will be steam-cleaned prior to use and <br /> between borings Visible soil, grease, and other impurities will be removed <br /> 2 Soil sampling equipment will be steam-cleaned prior to use and between each boring <br /> Pnor'to individual sample collection, any sampling device will also be cleaned in a <br /> TSP solution, and rinsed twice in clean water Any visible soil residue will be <br /> I f I <br /> removed <br /> :0 <br /> I e <br />
The URL can be used to link to this page
Your browser does not support the video tag.