Laserfiche WebLink
rz <br /> TPE SITE SAFETY PLAN <br /> 3 . MONITORING PLAN <br /> 3 . 1. (a) Air Monitoring Plan <br /> Action levels for implementation of air monitoring. Action <br /> levels should be based on published data available on <br /> contaminants of concern. Action levels should be set by <br /> persons experienced in industrial hygiene. <br /> Level Action Taken <br /> 10 ppm Total Volatiles Commence perimeter monitoring <br /> (b) Air Monitoring Equipment <br /> Outline the specific equipment to be used, calibration method, <br /> frequency of monitoring, locations to be monitored, and <br /> analysis of samples (if applicable) . <br /> PID, hexane calibration. Monitor at boreholes during each <br /> sampling event if vapors detected. <br /> If air monitoring is not to be implemented at this site <br /> explain why. <br /> N/A <br /> 3 . 2 Personnel Monitoring <br /> (Include hierarchy ,of responsibilities decision making on <br /> the site) <br /> site Safety Manager to Make Decisions <br /> I <br /> 3 . 3 Sampling Monitoring <br /> (a) Techniques used for sampling: Sample air at borehole <br /> with a PID. <br /> I <br /> (b) Equipment used for sampling: PID <br /> ` (c) Calibration of equipment: , Calibrated to hexane priors' <br /> If; II I ' I I I ' I toI operation, I <br /> I <br /> I <br /> I I II I III 6� I II I �I I�,I <br />