Laserfiche WebLink
WELL MONITORING/SAMPLING <br /> FIELD DATA SHEET <br /> Client) <br /> Facility4t Job#: __38 1039 C „ <br /> Address: Z VC. Date: <br /> City: Caves. Sampler: <br /> Well ID Well Condition: <br /> diKi <br /> Well Diameter In. Hydrocarbon Amount Bailed <br /> Thickness: I roduct/watarl• <br /> Total Depth 2 n- Volume 2"-017 3"-0.38 4"-0 66 <br /> Depth to Water <br /> t.3 . MoD Face- 1.50 12" 5 80 <br /> �. tor(VF) <br /> 4• rO X VF _ X 3 Wass volume) - Estimated Purge Volume: <br /> Purge Disposable Bailer Sampling <br /> Equipment: Bailer Equipment: (Disposable Bailer) <br /> [Stack) Bailer <br /> Suction Pressure Bailer <br /> Grundfos Grab Sample <br /> Other: Other: <br /> Starting Time: Ig%441 Weather Conditions: d{ <br /> Sampling Time: 1 &, D'S Water Color: C L9.raR <br /> Odor: lVo <br /> Purging Flow Rate: .4 ' l.S Sediment Description: <br /> Did well de-water? No if yes; Time: Volume: inaLR <br /> Time V,lohm),e, pH Conductivity Temperature D.O. ORP Alkalimlty <br /> cap 5 <br /> 20 <br /> �2:si S.v 7. 15 <br /> LABORATORY INFORMATION <br /> SAMPLE 10 ls)- CONTAINER REFRIG. PRESERV.TYPE ' LABORATORY ANALYSES - <br /> C- Z VOAV I AL Y HCL SEQUOIA TPHIGI/btexlm*e <br /> COMMENTS: <br /> wW <br />