Laserfiche WebLink
will be reported to the Health and Safety Director and the Regional Safety <br /> Coordinator <br /> • Fire/Explosion At least one Type ABC fire extinguisher will be maintained by the <br /> SHSO in the project vehicle. Additional fire extinguishers are required if SEACOR <br /> is responsible for site-wide health and safety. In the event of a fire/explosion the <br /> SHSO will make the determination as to whether the incident can be controlled with <br /> the manpower and equipment on site. If necessary, the referenced-fire response <br /> agency will be contacted. <br /> • SpiIl Contingency. Spill containment and clean-up will be the responsibility of the <br /> construction contractor or the SEACOR construction sub-contractor. These <br /> companies will provide the necessary equipment and manpower to properly handle <br /> such an emergency. in most cases, however, the UST's have been pumped free of <br /> any appreciable amount of liquids prior to removal. These Liquids are usually <br /> removed via vacuum truck where the likelihood of release is minimal. If such an <br /> event occurs and conditions present a health hazard to site personnel, the SEACOR <br /> SHSO will assume responsibility for the safety of SEACOR personnel and their <br /> sub-contractors. <br /> Rev 4/93 Q_7 rorn-hRclhIinlri,cr $,R.c <br />