Laserfiche WebLink
TABLE OF CONTENTS <br />' 10 INTRODUCTION 1 <br /> 20 BACKGROUND 1 <br />' 21 Site Setting and History 2 <br /> 22 Well Location Survey 3 <br /> I3 0 SCOPE OF WORK 3 <br /> 31 Underground Tank Removal 3 <br /> 32 Soil Vapor Survey 4 <br /> 33 Soil Borings 4 <br /> 34 Soil Sampling 4 <br /> 3 5 Groundwater Monitor Well Installation 5 <br /> 36 Vapor Extraction Well Installation 5 <br /> 37 Groundwater Monitoring and Sampling 5 <br /> 3 8 Soil Vapor Extraction Pilot Testing 6 <br /> 40 SITE CONDITIONS 6 <br /> 41 Hydrogeology 6 <br /> 42 Soil Sampling Results 7 <br /> 43 Groundwater Sampling Results 8 <br /> 50 REMEDIATION ALTERNATIVES 8 <br />' <br /> 51 Soil Excavation 8 <br /> 52 Soil Vapor Extraction 10 <br /> 53 In Situ Biodegradation 11 <br /> 54 Physical Containment or Chemical Neutralization 12 <br /> 60 CONCLUSIONS 12 <br /> 70 REFERENCES 13 <br /> I <br /> I <br /> 7OC1439 PAR 11 SEACOR• <br /> N0005-002-01 Wy 31 1994 <br /> i <br />