My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012674 CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2900 - Site Mitigation Program
>
PR0545951
>
ARCHIVED REPORTS_XR0012674 CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:41:48 PM
Creation date
8/6/2020 11:05:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012674 CASE 1
RECORD_ID
PR0545951
PE
3528
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Site Safety Plan October 15, 1990 <br /> ARCO Station No. 6020, Manteca, California AGS 30055-25 <br /> r <br /> suspected of containing potentially explosive levels of gasoline will be evaluated with an <br /> intrinsically safe or explosion-proof combustible gas indicator (CGI). Personnel response <br /> will be based on the following action levels from CGI readings: <br /> Less than 10 then Continue activities and <br /> percent of LEL" monitoring <br /> 10 to 25 percent then Continue monitoring <br /> of LEL with extreme caution as <br /> higher levels are <br /> encountered <br /> Greater than 25 then Explosion hazard. <br /> percent of LEL Cease activities and <br /> vacate area immediately <br /> * CGI readings in percent of lower explosive limit <br /> If an explosion potential is present onsite beyond 25 percent of the LEL then all Applied <br /> GeoSystems' personnel and subcontractors must immediately withdraw from the site. The <br /> hazard potential will be evaluated by Applied GeoSystems' management and a plan of <br /> action will be assessed. <br /> DECONTAMINATION PROCEDURES <br /> Drilling equipment and personal protective equipment will undergo gross decontamination <br /> onsite. This gross decontamination will include washing contaminated equipment with a <br /> trisodium phosphate (TSP) solution. Steam-cleaning is an acceptable alternative. <br /> EMERGENCY RESPONSE PROCEDURES <br /> In the event of a fire, explosion, or property damage, the nearest Applied GeoSystems <br /> Branch and the Administrative Office will be immediately notified. If necessary, local fire <br /> or response agencies will be called. <br /> 14 <br /> �-- A0,01ied GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.