Laserfiche WebLink
ARCO / BP WELL MONITORING DATA SHEET <br /> BTS # -^ `��� _• ��� Station # <br /> Sampler- Date <br />' Well T D _ Well Diameter 2 3 6 8 <br /> Total Well Depth -Ta, / Depth to Water 7� <br /> Depth to Free Product Thiclaness of Flee Product (feet) <br /> Refei enced to. PVc Grade DO Meter (if i eq'd)' HACH <br /> Writ 12mn,cier Mikan, Well UuhiaLlm <br /> 1" 004 4" 065 <br /> 2 t1 l6 6" t 47 <br /> 3 037 Other radius='0 163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Bailer Disposable Bailer <br /> MiddleburgEntraction Port <br />' Electric 5ubmerstblez"', Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> 2 _ <br /> ?� a �/ f;als <br /> I Case Volume(Gals} Specified Volumes Calculated Volume <br /> Conductivity <br /> TimeTime Temp (°r) PH (niS_Prn Gals Removed Observations <br /> 1� ✓ L <br /> Did well dewatei? cs No Gallons actually evacuated <br /> Sampling Time lz 20 Sampling Date M100/03. <br /> Sample I D ,i 5-- Labolatory- Pace equoia Other <br /> ' Analyzed for TPH-G BTE MTBE t1'H-D Otlzer � � � � � � �T� L <br /> O (lfreq'd) Pie-purge nt �L Post-purge �/'6e -P-/L <br /> OR P (lflcq'd) Pre-purge 111V Posl-purge 111V <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />