Laserfiche WebLink
ARCO / BP WELL MONITORING DATA SHEET <br /> BTS # Station # a- <br /> Sampler Date <br /> .z <br /> Well ID �� Well Diameter 2 3 Q G 8 <br /> Total Well Depth3 Dept11 to Water 2 <br /> Depth to Fixe Product Thickness ofFiee Product (feet) <br /> Refei enced to PVC Grade DO Meter (if req'd) _ HACH <br /> Wel!_Iii,3niucr MULURL= Well Diamelcr Ivluilipirer <br /> 1" 004 a" 065 <br /> 2' 0I6 G" 1 47 <br /> 3 037 Oihu radiusz•0 163 <br /> Purge Method Bailer Sampling Method Bailer <br /> Disposable Bailer Disposable Bailer <br /> Middleburg Extraction Port <br /> Electric Submersible Other <br /> Extraction Pump <br /> ' <br /> Other <br /> Top of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> of screen Otherwise, the well must be purged <br /> X � — <br /> - — - _ .�'z 3 , gals <br /> 1 Case Volume(Gals) Specified Volumes Calculated Volume <br /> ' Conductivity <br /> Time Temp {°F) pH (mS oria Gals Removed Observations <br /> 121141 C� 2— <br /> Did well dewatel? re ^ No Gallons actually evacuated <br /> Sampling Time ! Sampling Date � 3 <br /> Sample 1 D i - Labolatoiy Pace equola other <br /> Analyzed for PH- TEs MTBE TPH-D Other ) t r.5 v4 2 <br /> O (ifzeq'd) Pre-purge n,s/i" Post-purge <br /> ' O R P (if 1!eq'd) Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (408) 573-0555 <br />