Laserfiche WebLink
ARCO / BP WELL MONITORING DATA, SHEET <br /> BT5 # Station # <br /> Sampler Date• <br /> �l <br />' Well I.D Well Diameter 3 4 b S <br /> Total Well Depth �� Depth to Water. <br />' Depth to Free Product. Tluclmess of Fi ee P1 oduct (feet) <br /> Referenced to. CPv Grade D Q Meter (1f req'd) HACH <br /> �YCt�f31J file ler 1�'1iLwa�[ �Ve��, FImE't�r lvtull eller <br /> �" <br /> 004 4" 065 <br /> 016 G" 1 47 <br /> 3' 037 other 0 163 <br />' Purge Method Bailer Sampling Method Bader <br /> Disposable Bailer Disposable Bailer <br /> Middlebur-' Extraction Port Electric Submersible Other <br /> Extraction Pump <br /> Other <br /> Top of Screen If well is listed as a no-purge,confirm that water level is below the top <br /> oft screen Otherwise, the well must be purged <br /> f 4/ h <br /> Z'2' GALL Case Volume(Gals) Specified Volumes Calculated Volume <br /> ' Conductivity <br /> Time Temp (°F) pH (rnS or tE5 Gals Removed Observations <br /> 05` ' o- 9 12,37 <br /> [. -S <br /> Did well dewater? Yes ( Gallons actually evacuated -� <br /> Sampling Time cj Sampling Date g 3 <br /> Sample I D Laboiatoty- Pace equota Other <br /> Analyzed for TPl1 BT>;x MTBE TPit-D Other 's ev � - C -�])CIA <br /> O (if 1eq'd) Pre-purge �/L Post- ur a mb/ <br /> ' RP (if 1eq'd) Pre-purge mV Post-purge mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95192 (408) 573-0555 <br /> 1 <br />