My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005848 CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2900 - Site Mitigation Program
>
PR0545951
>
ARCHIVED REPORTS_XR0005848 CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2020 12:27:08 AM
Creation date
8/6/2020 11:36:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005848 CASE 2
RECORD_ID
PR0545951
PE
3528
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: July 212004 <br /> Quarter 2nd Quarter 2004 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 6020 <br /> Address 1711 E Yosemite Ave , Manteca, CA <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URSNernon Elarth <br /> Consultant Project No 38466530 OL058 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status Property owned by Atlantic Richfield Company <br /> WORK PERFORMED THIS QUARTER (Second 2004): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2004): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY (Second 2004): <br /> • Current Phase of Project _Monitoring <br /> Frequency of Groundwater Sampling MW-5 through MW-10 sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present Onsite No _ <br /> Current Remediation Techniques Natural attenuation <br /> Approximate Depth to Groundwater _21 69 to 24 66 feet below ground surface (bgs) <br /> Groundwater Flow and Gradient Northeast to Northwest @ 0 004—0 005 feet/foot (ft/ft) <br /> ANALYTICAL DATA REVIEW: <br /> Please note that as of April 1,2004, the laboratory has changed the carbon range for gasoline range organics (GRO) <br /> from C6 — CIO to C4 — C12 (to include the oxygenates) The resulting data may be impacted by the potential <br /> inclusion of additional total petroleum hydrocarbons as gasoline (TPHg) and non-TPHg analytes within the revised <br /> carbon range, which may result in a higher reported concentration Where the resulting GRO concentration is based <br /> on a single analyte(i e,a non-TPHg analyte or a single TPHg analyte),the analyte will be identified if possible <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results,MS/MSD results, and surrogate recoveries), the data are acceptable as reported by the laboratory <br /> with the following limitations <br /> • The elevated reporting limits were due to dilutions performed by the laboratory in order to quantitate a <br /> target analyte <br /> K MVMCrsM BP ARC01060201Q..nw1y12 QTR 0416020 GWMR 2004 do Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.