My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003573
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2427
>
3500 - Local Oversight Program
>
PR0545952
>
ARCHIVED REPORTS_XR0003573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:25:11 AM
Creation date
8/6/2020 11:46:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003573
RECORD_ID
PR0545952
PE
3528
FACILITY_ID
FA0003495
FACILITY_NAME
ABF FREIGHT SYSTEMS INC
STREET_NUMBER
2427
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19817006
CURRENT_STATUS
02
SITE_LOCATION
2427 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety and Health Plan <br /> Site Contamination Work Plan,ABF Freight Systems,Inc <br /> 2427 West Yosemite Avenue,Manteca,California F Freight System,Inc <br /> . Manteca,California Page 4 <br /> Table - <br /> Emergency Telephone Numbers <br /> Agency/Contact Name Contact Phone <br /> National Response Center HAZMAT <br /> (800)424-8802 <br /> Polson Control Center UCSF General Hospital (800) 523-2222 <br /> Hazardous Waste/NationaI Response Center HAZMAT (800)424-8802 <br /> Project Manager Joseph Krohn (707)446-7996 <br /> Pager(707)434-5623 <br /> Site Safety and Health Officer Steve Essert (707)446-7996 <br /> Pager(707)420-6187 <br /> Health& Safety Manager George Caesar (510)930-8282 <br /> Client Contact Chns Brown (501) 785-8639 <br /> Site Contact Richard Provost (209) 823-2151 <br /> 1.4 Site Personnel <br /> Personnel authorized to enter the ABF Freight System, Inc site while operations are being <br /> conducted must be approved by the Project Manager CAL INC's field staff will comply with the <br /> medical examination requirements as specified by OSHA 29 CFR 1910 120, 8 CCR 5192 and/or <br /> other applicable regulations and review and this SSHP All personnel must utilize the buddy <br /> system or trained escort, and check in with the Field Supervisor at the Command Post <br /> Name 40-hr 8-hr 8-hr CPR First <br /> Haz- Haz- Super/ Aad <br /> Woper Woper Mgr <br /> I Joseph Krohn 5/85 6/96 10/91 2/94 1 2/93 <br /> 2 Steven Essert 16/96 3/97 1 6197 1 6/97 <br /> Training information for subcontractors utilized during the project will be provided during the <br /> project start up <br /> • <br /> i <br /> N TROJECTSW721P1ans and Reports\Dnlling SSHP 2 doc May 6, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.