My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003573
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2427
>
3500 - Local Oversight Program
>
PR0545952
>
ARCHIVED REPORTS_XR0003573
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 5:25:11 AM
Creation date
8/6/2020 11:46:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003573
RECORD_ID
PR0545952
PE
3528
FACILITY_ID
FA0003495
FACILITY_NAME
ABF FREIGHT SYSTEMS INC
STREET_NUMBER
2427
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
19817006
CURRENT_STATUS
02
SITE_LOCATION
2427 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Safety and Health Plan <br /> Site Contamination Work Plan,ASF Freight Systems, Inc <br /> 2427 West Yosemite Avenue,Manteca,California F Freight System,Inc <br /> . Manteca,California Page 7 <br /> 5 Monitoring Well Construction, <br /> 6 Drilling Spoils and Groundwater Disposal, and <br /> 7 Site Restoration <br /> Are any off-site tasks planned? NO <br /> 3.3 Utility Clearance <br /> • To be performed by Underground Service Alert <br /> • Date to be performed Prior to work <br /> • Utility clearance methods proposed na <br /> • The Utilities Clearance Checklist Form (Attachment 3) must be completed and returned to <br /> the Project Manager for review and signature, with copies forwarded to the Health and Safety <br /> Manager and project file <br /> 4.0 TASK-SPECIFIC SAFETY AND HEALTH RISK ANALYSIS <br /> 4.1 Hazard Analysts <br /> A project specific hazard analysis has been developed and is presented in Attachment 4 The <br /> hazard analyses provides principal steps for each "feature of work" identified for the project In <br /> general, the following features of work have been identified with respect to site tasks and <br /> operations <br /> 1 Subsurface drilling, <br /> 2 Soil Sampling, <br /> 3 Groundwater Sampling, <br /> 4 Equipment Decontamination, <br /> 5 Monitoring Well Construction, <br /> 6 Drilling Spoils and Groundwater Disposal, and <br />• <br /> N TROJEC`rSU2721P1ans and ReportslDrilling SSHP 2 doc May 6, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.