My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:43:30 AM
Creation date
8/6/2020 1:33:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page a of 6) <br />VIII. MONITORING SYSTEM AND PROGRAMMING <br />Y=Yes, N = No, NA=Not <br />This section must be completed if a monitoring panel is used to perform leak detection monitoring. <br />Y <br />N <br />NA <br />Are the visual and audible alarms operational? <br />0 <br />El <br />1:1 <br />Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely,FX <br />functionally tested, and confirmed operational? <br />19 <br />❑ <br />❑ <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br />their proper operation? <br />❑X <br />❑ <br />❑ <br />Was monitoring system set-up reviewed to ensure proper settings? <br />QX <br />El <br />1:1 <br />Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? <br />Q <br />❑ <br />❑ <br />Does the flow of fuel stop at the dispenser if a leak is detected in the under -dispenser containment? <br />❑X <br />❑ <br />❑ <br />Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br />disconnected? <br />0 <br />❑ <br />❑ <br />Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br />Which sensors initiate positive shut down? (Check all that apply.) ❑X Sump ❑ Under -Dispenser Containment <br />0 <br />❑ <br />❑ <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />El <br />❑ <br />❑X <br />For any answer of "M' above, describe in Section IX how and when these deficiencies were or will be corrected. <br />IX. COMMENTS <br />X. IN -TANK GAUGING TESTING <br />❑ Check this box if tank gauging is used only for inventory control. (Do not complete this section) <br />❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) <br />This section must be completed if in -tank gauging is used to perform leak detection monitoring. <br />Y <br />N <br />NA <br />Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for <br />round faults? <br />n <br />❑ <br />❑ <br />Were all in -tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally <br />tested, and confirmed operational? <br />Was accuracy of system's product level readings tested? <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />❑X <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />0 <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Q <br />❑ <br />❑ <br />For any answer of "M' above, describe in Section XI how and when these deficiencies were or will be corrected. <br />XI. COMMENTS <br />Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.