Laserfiche WebLink
Table 4: Estimated Future Sanitary Wastewater Loadings(a) - DRAFT <br /> Estimated Sanitary Total Nitrogen TSS'*) BOD50) <br /> Wastewater Flow(b)(gpd)(c) Loading(lbsldav)(d) Loading(Ibsldav) Loading(lbs/day) <br /> Non- Non- <br /> Septic System ID Number Crush Non-Crush Crush Non-Crush Crush Crush Crush Crush %of Total <br /> and Location Season Season Season Season Season Season Season Season Loading191 <br /> 1 -Visitors Center Employees 180 180 0.06 0.06 0.32 0.32 0.29 0.29 2%_ <br /> Visitors 170 170 0.06 0.06 0.30 0.30 0.27 0.27 2% <br /> 2-Grower/Barrel B Employees 270 120 0.09 0.04 0.47 0.21 0.43 0.19 3% <br /> Visitors 32 0 0.01 0.00 0.06 0.00 0.05 0.00 0.2% <br /> 3-Production Office/ Em to ees 2 490 1,530 0.83 0.51 4.36 _ 2.68 3.95 2.42 27% <br /> Maintenance Visitors 48 24 0.02 0.01 0.08 0.04 0.08 0.04 0.5% <br /> 4-Barrel Warehouse A Employees 930 705 0.31 0.24 1.63 1.23 1.47 1.12 11% <br /> 5-Rotovac/Cellar Employees 210 _ 120 0.07 0.04 0.37 0.21 0.33 0.19 2% <br /> 6-Bottling Warehouses Employees 3,270 3,270 1.09 1.09 5.73 5.73 5.18 5.18 44% <br /> 7-Trucker's Restroom Employees 135 75 0.05 0.03 0.24 0.13 0.21 0.12 1% <br /> _ _ Visitors 140 50 0.05 0.02 0.25 0.09 0.22 0.08 1% <br /> 8-WarehouseC/Corkland Employees 300 300 0.10 0.10 0.53 0.53 0.48 0.48 4% <br /> 9-Staging Area Employees 135 0 _ 0.05 0.00 0.24 0.00 .___,0.21_ 0.00 -. 1% <br /> Visitors 140 0 0.05 0.00 0.25 0.00 1 0.22 0.00 1% <br /> Working-Day Totals 8,450 6,544 2.8 2.2 14.8 11.5 13.4 10.4 - <br /> Season <br /> Totals 887,250"� 1,145,200(11 296'') 382to 1,554 2,006'2,006�'� 1,406(h) 1,815II <br /> (a) Preliminary sanitary wastewater loading calculations at the Woodbridge Winery based on estimated sanitary wastewater flows(Table 3)and typical sanitary <br /> wastewater quality(Table 5). For purposes of estimating loadings,crush and non-crush season sanitary wastewater flows were assumed to be medium-strength. <br /> (b) Estimated sanitary wastewater flow,based on Table 3. <br /> (c) gpd=gallons per working-day <br /> (d) lbs/day=pounds per working-day <br /> (e) TSS=total suspended solids <br /> (f) BODS=5-day biochemical oxygen demand <br /> (g) Septic system location loading contribution as a percentage of the total sanitary wastewater loading.For example, Septic System ID Number 1 -Visitor Center <br /> contributes 4%(employees plus visitors)of the total sanitary wastewater loading at the Facility. <br /> (h) Assumes 105 working-day crush season. <br /> (i) Assumes 175 working-day non-crush season. <br /> Updated Sanitary Wastewater Estimates Page 1 of 1 <br /> Woodbridge Winery, Acampo, California <br /> p Ys-prog12003',030113 05_woodbnd9e',e dart'-s1uf3a0k 04 loadmgs Ude Aaure ooc <br />