My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2200 - Hazardous Waste Program
>
PR0541637
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2020 1:55:38 PM
Creation date
8/7/2020 1:47:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0541637
PE
2226
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Baker, Lydia <br />From:Jensen, Evan P <EJensen@sfwater.org> <br />Sent:Wednesday, April 24, 2019 2:03 PM <br />To:'Kenny, Brendan@Waterboards'; Backus, Garrett <br />Cc:Nelson, Chris; Ritchie, Steve; McAuliffe, Dan F; Ritchie, Steve; MALINA, CATHERINE (CAT); <br />RODDY, JOHN (CAT); ROBINSON, RICHARD (CAT); Cheung, Angela; Ramirez, Tim; <br />Natesan, Ellen; Fedman, Anna; Moghbel, A Keyvan; Li, Annie (PUC); Yu, Anthony; <br />Yturralde, Nicole; Guerra, Joe; Cheung, Angela; Sibbring, Justin; Macaulay, Ian; Cordua, <br />Matthew; Sebastiani, Enio; Forner, Ed; Carlevaris, Joseph; Jung, Jowin; Baker, Lydia <br />Subject:RE: Tesla Treatment Facility update April 2018 <br />Attachments:UV 2040_Lamp 2-2 break_incident report_3-20-19.docx <br />Hi Brendan, Garrett, <br /> <br />Below is a summary on the on-going situation at the Tesla Treatment Facility (TTF). <br /> <br />The Tesla plant has been back on operation mode since March 11. A lamp break occurred on 3/20. The incident report is <br />attached. The emergency bypass system routed all water outside to the baker tanks where it remains. <br /> <br />We have extended the rental period 6 months for the pump, baker tank, etc. which comprise the emergency bypass <br />system. This system is still in place, and functioned as expected during the most recent lamp breaks. Discussions about <br />permitting for on-site water disposal, permanent mitigation design and root cause are ongoing. <br /> <br />Thanks, <br /> <br />Evan Jensen <br /> <br />Evan Jensen, Hydrologist <br />Water Supply and Treatment Division - Water Enterprise <br />San Francisco Public Utilities Commission <br />1000 El Camino Real <br />Millbrae, CA 94030 <br />Office: (650) 871-1010 <br />Mobile: (520) 304-4814 <br />ejensen@sfwater.org <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.